Step
|
Action
|
|
1.
|
Log into SSTA using your
user ID (employee ID) and password.
|
|
2.
|
From the SSTA homepage,
click on the SELF SERVICE link located in the menu box.
|
|
3.
|
You will arrive at the SELF SERVICE page.
Click on the TIMESHEET link to access your timesheet.
|
|
4.
|
Your timesheet will be displayed, complete with
your populated work schedule.
|
|
5.
|
If you are a labor distribution employee, you will
need to report your time worked and identify time spent on specific projects
on your timesheet. This will be done by assigning hours worked to various
combo codes
Note: A COMBO CODE is data which
represents time charged to a particular project or account. The process of
choosing a combo code is easy and is very similar to choosing a time
reporting code.
|
|
6.
|
Adjust your hours worked in the existing row to
reflect your time worked on a specific project (i.e. if you worked 2 hours
(9:00AM-11:00AM) on a specific project on Monday, change your IN and OUT
times in the pre-populated schedule for Monday).
|
|
7.
|
To add time worked on another project, scroll to
the right of the timesheet page and click the ADD A ROW (+) icon
|
|
8.
|
In the newly added row, enter your time worked on
the second project that day by adding another IN and OUT time.
(i.e. if you worked 11:00AM-12:00PM on a project on Monday put an IN time of
11:00:01Note that the same OUT time from the previous row cannot be used and
record and OUT time of 12:00:01PM to balance your reported hours).
Illustrative Example:

|
|
9.
|
Scroll to the right and click the find the COMBO
CODE column and click on the magnifying glass icon in the appropriate
row.
This opens the LOOK UP
COMBO CODE dialogue box. Scroll through the combo code values and select
the appropriate COMBO CODE link.
You will need to repeat
this step for each row added.
|
|
10.
|
Notice the combo code field has been populated with
the selected combo code.
|
|
11.
|
Next, if instructed by your agency, you will need
to select USER FIELDS by scrolling to the right. Labor distribution
timesheets have five columns entitled USER FIELD 1, USER FIELD 2, USER
FIELD 3, USER FIELD 4 and USER FIELD 5. User Fields further drill
down time worked on a particular project and can charge time to specific
tasks or other accounts. Instructions on the appropriate use of USER FIELDS
will be communicated to you by a representative from you agency.
Note: If you do not have user fields to enter, you
can review your time and submit.
|
|
12.
|
Repeat steps 6-11 as necessary.
|
|
13.
|
If you have no changes, click the SUBMIT
button to route your timesheet for approval to your supervisor or manager.
|
|
14.
|
The SUBMIT CONFIRMATION page will display.
By clicking the OK button on this page, you are certifying your attendance
record.
|
|
15.
|
Review your REPORTED HOURS and SCHEDULED
HOURS information above your timesheet. If your reported hours are less
than your scheduled hours, please review your timesheet for accuracy.
|
|
16.
|
Review the REPORTED HOURS SUMMARY table for
accuracy.
|
|
17.
|
Review the STATUS column in the REPORTED
TIME STATUS table. Notice that the value in the status column is now NEEDS
APPROVAL. After your manager/supervisor reviews the time you submit the
status will change to either APPROVED or DENIED.
|
|
18.
|
Click on the SIGN OUT link to log out
of SSTA.
|