Contractor: J.C. Cannistraro, LLC
Cost: $22,768,686
Estimated Substantial Completion:
Hogan - January 2013
Wrentham - February 2013
Project Estimated Savings:
Hogan: $1,081,890 annual savings
1,114,636 kwh
670,949 gallons oil
1,025,465 electricity CO2 Reduction
Wrentham: $1,374,662 annual savings
6,374,544 kwh
766,267 gallons oil
5,864,580 electricity CO2 Reduction
This project involves central power plant upgrades and other energy related conservation measures.
Project Features:
- Power plant decentralization
- Retrofit or replace lighting fixtures
- Install lighting controls
- Install/upgrade and Retro-commission Energy Management System
- Heating, Ventilating, and Air Conditioning
- Upgrade Air Handling Units Constant Volume to Variable Air Volume
- Install weather stripping
- Install motors and variable frequency drives
- Install automatic pool cover