Massasoit Community College

Contractor: Johnson Controls, Inc.
Cost:
$7,494,115
Project Estimated Savings: $529,722 annual savings
Completed: Phase I completed June 2011, Phase II anticipated completion is August 2012

 

 

Project Details:

Massasoit Community College, in conjunction with the Division of Capital Asset Management (DCAM) are in the process of completing an energy project that includes design, modification, and installation of existing and new equipment which will reduce energy and/or water consumption associated with the heating, ventilation, and air conditioning systems, the lighting system, building envelope, the domestic hot water system, and other energy and water using devices.

Project Highlights:

  • Lighting & Lighting Controls
  • Motors
  • Energy Management Systems
  • Domestic Water Conservation
  • Variable Frequency Drives (VFD's)
  • Roof Top Units
  • Demand Controlled Ventilation