Listed below are solicitations with the Division of Capital Asset Management and Maintenance.

For more information on DCAMM solicitations, search for DCAMM at www.commbuys.com/bso/ 

Open Solicitations

Closing Date

Comprehensive Energy Project at Mass Hospital School
Sealed proposals are requested for providing design, equipment purchase, installation, commissioning/measurement & verification (M&V), warranty services, and maintenance at: Massachusetts Hospital School Facility located in Canton, MA, from a contractor Division of Capital Asset Management and Maintenance certified under the Standard Category of General Building Construction, Mechanical Systems, and/or Energy Management Systems.
6/24/2016 - 2:00 PM
SDF1401E-EC1 Sheriff's Department Franklin County
This Energy Design Build project include the design, procurement, installation, and commissioning of fourteen (14) ECMs and five (5) required alternates. Major energy conservation measures include DHW Solar Thermal system, Solar PV Canopy, VFDs, Heat Recovery, lighting upgrades, shower controls and kitchen hood controls; among others.
7/21/2016 - 2:00 PM
SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham
Pursuant to Chapter 25A 11c, an Energy Design Build RFP for Norfolk Sheriffs Office, in Dedham, MA was posted on COMMBUYS, June 8, 2016, for a contract to finalize design, install, and commission various ECMs, including (but not limited to) LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), CHP and other building improvements.
8/10/2016 - 2:00 PM

Recently Closed Solicitations & Awarded Projects
Name & Description

Award Recipient

Contact DCAMM
617-727-4030

Bristol County Sheriffs Office - Energy Project, North Dartmouth and New BedfordEnterprise Equipment Company, Inc.Mike Reinhardt
x 31234
Roxbury Community College Energy & Water Upgrades Tony Ransom
x31390
University of Massachusetts Lowell - UMass Lowell - Energy Design Build ProjectConstellation New Energy, Inc.Jeremy Caron
x 31479
For Equipment, Design, and Installation of New Boiler, Back Pressure Steam Turbine and Energy Conservation Measures for Massachusetts College of Liberal Arts, North AdamsAdams Plumbing and Heating, Inc.Dave Lewis
x 31472

SDE - Essex Sheriff's Dept. - Multisite - Energy & Water Retrofit - Construction

Project requires the design, installation, commissioning and maintenance of multiple energy and water conservation measures (ECMs). Measures include, but are not limited to, high efficiency condensing boilers, lighting upgrades, main switchgear replacement, water control measures, solar PV arrays and solar thermal.

J.C. Cannistraro, LLCJeremy Caron
x 31479

Equipment, Design, and Installation of Solar Thermal at Massachusetts Maritime Academy (Project # MMA1401E EC1)

The Commonwealth is interested in turnkey Proposals for design, equipment purchased and installation, balance of systems, permitting, interconnection, startup and commissioning, warranty services, and maintenance of a solar thermal system. Services are also requested for training in preventive maintenance and operation of the system.

Weston and SampsonKrista Lillis
x 31428

Request for Proposals for Energy Design Build for Middlesex House of Correction in Billerica

Project requires design, installation and commissioning of multiple energy conservation measures (ECMs). Measures include high efficiency condensing boilers, lighting upgrades, combined heat and power, transformer replacements, water control measures, Solar Thermal and Solar PV arrays.

NorescoMike Reinhardt
x 31234
Salem State University Energy Performance Contract (SSA1101-ES1)|
Comprehensive energy and water performance contracting services at Salem State University.
Constellation EnergyMike Reinhardt
x 31234
FSC1301E ES1/EC1 Fitchburg State University Energy and Water Retrofit Project
Fitchburg State University Energy and Water Retrofit RFP Energy and Water Retrofit Project at Fitchburg State University in Fitchburg, MA, for lighting and controls upgrades, HVAC equipment repairs and replacements, domestic water updates, boiler and chiller plant replacements, and retro-commissioning ECMs
 Jeremy Caron
x 31479

To be added to the distribution list to receive periodic e-mail notifications of updates or to edit your contact information, please e-mail Stephen White at stephen.white@state.ma.us. Unless specifically listed otherwise, you may contact Jenna Ide, Program Manager for the Energy Efficiency and Sustainable Buildings Group at DCAMM at jenna.ide@state.ma.us or (617) 727-4030 x31487.

The Model Audit Contract, the Model Energy Services Agreement (ESA) for Comprehensive Energy Projects and the Standard ESA for Equipment, Design and Installation for projects procured under M.G.L. Chapter 25A Sec. 11c are now posted at the Energy Performance Contracting Program Page Energy Performance Contracting Program Page