Listed below are solicitations with the Division of Capital Asset Management and Maintenance.

For more information on DCAMM solicitations, search for DCAMM at www.commbuys.com/bso/ 

Please note, effective 3/24/14 COMMBUYS, the Commonwealth's new electronic procurement system replaced Comm-PASS.  Check COMMBUYS Information Page, for additional details on this transition. 

Open Solicitations

Closing Date

University of Massschusetts Lowell - UMass Lowell - Energy Design Build Project7/24/14 - 2:00 pm
For Equipment, Design, and Installation of New Boiler, Back Pressure Steam Turbine and Energy Conservation Measures for Massachusetts College of Liberal Arts, North Adams08/21/14 - 2:00 pm
  

Closed Solicitations & Awarded Projects
Name & Description

Award Recipient

Contact DCAMM
617-727-4030

Middlesex Community College HVAC System Improvements and Energy Upgrades for the Bedford, MA Campus. (Project # MCC1301E-EC1) Raymond Soohoo
x 31509

SDE - Essex Sheriff's Dept. - Multisite - Energy & Water Retrofit - Construction

Project requires the design, installation, commissioning and maintenance of multiple energy and water conservation measures (ECMs). Measures include, but are not limited to, high efficiency condensing boilers, lighting upgrades, main switchgear replacement, water control measures, solar PV arrays and solar thermal.

 Jeremy Caron
x 31479

Equipment, Design, and Installation of Solar Thermal at Massachusetts Maritime Academy (Project # MMA1401E EC1)

The Commonwealth is interested in turnkey Proposals for design, equipment purchased and installation, balance of systems, permitting, interconnection, startup and commissioning, warranty services, and maintenance of a solar thermal system. Services are also requested for training in preventive maintenance and operation of the system.

 Krista Lillis
x 31428

Request for Proposals for Equipment, Design, and Installation of Energy and Water Conservation Measures - Plymouth County Sheriff, Plymouth (Project SDP1202-EC1)

Project requires design, installation and commissioning of multiple energy conservation measures. Measures include outdoor lighting, lighting controls for offices, kitchen hood controls, ventilation controls, ozone laundry, retro-commissioning, waterflow control devices and cogeneration.

 Heidi Green
X 31386

Request for Proposals for Energy Design Build for Middlesex House of Correction in Billerica

Project requires design, installation and commissioning of multiple energy conservation measures (ECMs). Measures include high efficiency condensing boilers, lighting upgrades, combined heat and power, transformer replacements, water control measures, Solar Thermal and Solar PV arrays.

 Mike Reinhardt
x 31234
Berkshire House of Correction Energy Design/Build (Project #SDB1201E EC1)
Project requires the design, installation and commissioning of multiple energy conservation measures (ECMs). Measures include high efficiency condensing boilers, domestic hot water instantaneous tanks, Energy Management System, Solar Thermal and Solar PV arrays.
Millenium Inc.John Crisley 
x 31561
Energy and Water Upgrades at John W. McCormack and Erich Lindemann Buildings (Project #DCP1021 EC1)
Equipment Design and Installation of Energy and Water Upgrades at John W. McCormack and Erich Lindemann Buildings, Boston
NorescoKrista Lillis
x 31428
Springfield Technical Community College - Decentralize HVAC Systems  (Project #STC1318E ES1)
Replacement of the existing Central Plant HVAC systems with a centralized cooling system, and decentralized heating systems.
JF White Contracting Company Tony Ransom
x 31390
North Central Correctional Institution, Gardner -Equipment Design and Installation of Heating Plant Upgrades and Energy Conservation Measures
Design and installation services of energy and water conservation measures including new dual-fuel gas and oil fired central steam boilers at the North Central Correctional Institution in Gardner, MA.
Constellation EnergyMichael Reinhardt
x 31234 
Salem State University Energy Performance Contract (SSA1101-ES1)|
Comprehensive energy and water performance contracting services at Salem State University.
Constellation EnergyMike Reinhardt
x 31234
Plymouth County Correctional Facility Wind Turbine Project (CPL0702 EC1)
This project will include the final design, installation, procurement, commissioning and maintenance of one 1.5-2 MW wind turbine and associated systems.
JK ScanlanJames Freeley
x 31239
Trial Courts Western Region 6 Energy Project - Request for Proposals (TRC0802 EC2)
Energy and water conservation services for 514,495 square feet of trial courts facilities in ten (10) locations in Chicopee, Holyoke, Northampton, Palmer, Pittsfield, and Springfield, MA.
BG MechanicalJohn Crisley
x 31561
Equipment Design Build Project for Bunker Hill Community College (BHC1001-ES1)
Central power plant upgrades, new chillers, new boilers, lighting improvements, and various energy conservation measures at Bunker Hill Community College.
Fred Williams, Inc.Tony Ransom
x 31390
UMass Dartmouth Wind - Performance Contract (UMD0901 ES1)
Installation of wind turbine equipment, associated systems, and foundation design at the University of Massachusetts Dartmouth, Dartmouth, MA
J.K. Scanlan Company, Inc.Michael Reinhardt
x 31234
 Framingham State University Comprehensive Energy Project (FRC1001 EC2)
Comprehensive energy and water audit and construction services at Framingham State University, Framingham, MA.
BG Mechanical Contractors, Inc.Tony Ransom
x 31390
Massasoit Community College, Comprehensive Energy Performance Contract (MAS 0801 EC1)Johnson Controls Inc.James Freeley
x 31239
MA State Police Headquarters and Training Academy, Comprehensive Energy Performance Contract (POL 0303 EC1)Constellation EnergyDave Lewis
(413) 577-6283
UMass Dartmouth, Comprehensive Energy Performance Contract (UMD 0801 EC1)NorescoMike Reinhardt
x 31234

To be added to the distribution list to receive periodic e-mail notifications of updates or to edit your contact information, please e-mail Erin Ross at erin.ross@state.ma.us. Unless specifically listed otherwise, you may contact Jenna Ide, Program Manager for the Energy Efficiency and Sustainable Buildings Group at DCAMM at jenna.ide@state.ma.us or (617) 727-4030 x31487.

 

The Model Audit Contract, the Model Energy Services Agreement (ESA) for Comprehensive Energy Projects and the Standard ESA for Equipment, Design and Installation for projects procured under M.G.L. Chapter 25A Sec. 11c are now posted at the Energy Performance Contracting Program Page Energy Performance Contracting Program Page