Listed below are solicitations with the Division of Capital Asset Management and Maintenance.

For more information on DCAMM solicitations, search for DCAMM at Commonwealth Procurement Access & Solicitation System (Comm-PASS).

 

Open Solicitations

Closing Date

Berkshire House of Correction Energy Design/Build (Project #SDB1201E EC1)
Project requires the design, installation and commissioning of multiple energy conservation measurues (ECMs). Measures include high efficiency condensing boilers, domestic hot water instantaneous tanks, Energy Management System, Solar Thermal and Solar PV arrays.

For details please see the Division of Capital Asset Management and Maintenance section on Comm-PASS

5/10/13 - 2:00 pm

Closed Solicitations & Awarded Projects
Name & Description

Award Recipient

Contact DCAMM
617-727-4030

Energy and Water Upgrades at John W. McCormack and Erich Lindemann Buildings (Project #DCP1021 EC1)

Equipment Design and Installation of Energy and Water Upgrades at John W. McCormack and Erich Lindemann Buildings, Boston

  
Bristol Community College Wind Project (Project #BRC1101E-EC1)

Equipment, Design, and Installation of Wind Turbine and Associated Systems at Bristol Community College
  

Springfield Technical Community College - Decentralize HVAC Systems  (Project #STC1318E ES1)

Replacement of the existing Central Plant HVAC systems with a centralized cooling system, and decentralized heating systems.

  

Equipment Design and Installation of Heating Plant Upgrades and Energy Conservation Measures at North Central Correctional Institution, Gardner

Design and installation services of energy and water conservation measures including new dual-fuel gas and oil fired central steam boilers at the North Central Correctional Institution in Gardner, MA.

 Michael Reinhardt
x 234 
UMASS Energy Performance Contract/Equipment Design and Installation - Request for Proposals (UMA1101 EC1)
Equipment design, purchase and installation of lighting controls, HVAC and occupancy controls and energy management system optimization.
Thielsch Eng., Inc.Dave Lewis
(413) 577-6283
Equipment, Design, and Installation of  Lighting Upgrades at State House, Boston- Request for Proposals  (BSB1201 EC1)
Executing and completing all work required for Massachusetts Project #BSB1201 EC1 lighting upgrades at the State House in Boston, MA. Scope includes all Labor, Materials, Equipment and Services required to perform the Design and Installation of lighting systems as detailed in the RFP
Dagle ElectricKrista Lillis
x 428
Northern Essex Community College, Comprehensive Energy Project - Request for Proposals (NEC0901-ES1)
RFP (specifications and terms) for an Energy Design Build project at Northern Essex Community College campuses located at 100 Elliott Street, Haverhill, MA, and 45 Franklin Street, Lawrence, MA
Enterprise Equipment CompanyTony Dover
x 446
Middlesex Community College, Bedford - Equipment, Design, and Installation of Trustee's House Ground Source Heat Pump (MCC 0901 EC2)
Design, installation, and commissioning of one ground source heat pump (GSHP) system to be integrated into the existing HVAC system for Trustee House (9,800 square feet). The proposed design calls for a closed loop geothermal heat exchanger field and all associated equipment, drilling, and connection to the existing HVAC system.
CONECO Energy, LLCJohn Crisley
x 561
Salem State University Energy Performance Contract (SSA1101-ES1)|
Comprehensive energy and water performance contracting services at Salem State University.
Constellation EnergyMike Reinhardt
x 234
Plymouth County Correctional Facility Wind Turbine Project (CPL0702 EC1)
This project will include the final design, installation, procurement, commissioning and maintenance of one 1.5-2 MW wind turbine and associated systems.
JK ScanlanJames Freeley
x 239
Trial Courts Western Region 6 Energy Project - Request for Proposals (TRC0802 EC2)
Energy and water conservation services for 514,495 square feet of trial courts facilities in ten (10) locations in Chicopee, Holyoke, Northampton, Palmer, Pittsfield, and Springfield, MA.
BG MechanicalJohn Crisley
x 561
Equipment Design Build Project for Bunker Hill Community College (BHC1001-ES1)
Central power plant upgrades, new chillers, new boilers, lighting improvements, and various energy conservation measures at Bunker Hill Community College.
Fred Williams, Inc.Tony Dover
x 446
Taunton State Hospital Energy Performance Contracting Project (DMH0902 ES1)
Comprehensive energy and water conservation measures at Taunton State Hospital and other Statewide
Department of Mental Health Facilities
Johnson ControlsJames Freeley
x 239
Equipment Design Build Project for Hogan Regional and Wrentham Developmental Centers, DDS (DMR0501 EC1)
Central power plant upgrade, new generators, new CHP unit and varius energy conservation measures at the Wrentham Developmental Center. Central power plant decentralization, new boilers, new generators and other energy conservation measures at Hogan Regional Center.
J.C. Canistrano, LLCJames Freeley
x 239
UMass Dartmouth Wind - Performance Contract (UMD0901 ES1)
Installation of wind turbine equipment, associated systems, and foundation design at the University of Massachusetts Dartmouth, Dartmouth, MA
J.K. Scanlan Company, Inc.

Tony Ransom
x 390

Michael Reinhardt
x 234

 Framingham State University Comprehensive Energy Project (FRC1001 EC2)
Comprehensive energy and water audit and construction services at Framingham State University, Framingham, MA.
BG Mechanical Contractors, Inc.Tony Dover
x 446
Energy Conservation Measures at North Shore Community College (NSC 1101 EC1)
Energy Design Build Project at North Shore Community College in Lynn and Danvers, MA
BG Mechanical Contractors, Inc.Krista Lillis
x 428
Mount Wachusett Community College - Wind Turbine InstallationJ.K. Scanlan Company, Inc.John Crisley
x 561
Massasoit Community College, Comprehensive Energy Performance Contract (MAS 0801 EC1)Johnson Controls Inc.James Freeley
x 239
North Central Correctional Institution (NCCI) Gardner, Two (2) Wind Turbine Installations (DOC0702 EC1)J.K. Scanlan Company, Inc.Krista Lillis x 428
Five (5) Dept. of Correction Facilities, Solar PV Design and Installation Services  (DOC 1001 EC1)JF White Contracting CompanyTony Dover
x 446 
Six (6) Western Mass. Facilities, Solar PV Design and Installation Services  (DCP 1006 EC1)Ostrow Electric Company Inc.Tony Dover
x 446
Seven (7) Eastern Mass. Facilities, Solar PV Design and Installation Services (DCP 1007 EC1)Ostrow Electric Company Inc.Tony Dover
x 446
MA State Police Headquarters and Training Academy, Comprehensive Energy Performance Contract (POL 0303 EC1)Constellation EnergyDave Lewis
(413) 577-6283
UMass Amherst, 2 MW Steam Turbine Generator (UMA 0902 EC1)ThielschDave Lewis
(413) 577-6283
UMass Dartmouth, Comprehensive Energy Performance Contract (UMD 0801 EC1)NorescoMike Reinhardt
x 234
Worcester Jail and House of Corrections, Comprehensive Energy Performance Contract (SDW 0901 EC1)Constellation EnergyKrista
Lillis
x 428

To be added to the distribution list to receive periodic e-mail notifications of updates or to edit your contact information, please e-mail Erin Conway at erin.conway@state.ma.us. Unless specifically listed otherwise, you may contact Jenna Ide, Program Manager for the Energy Efficiency and Sustainable Buildings Group at DCAMM at jenna.ide@state.ma.us or (617) 727-4030 x 487.

 

The Model Audit Contract, the Model Energy Services Agreement (ESA) for Comprehensive Energy Projects and the Standard ESA for Equipment, Design and Installation for projects procured under M.G.L. Chapter 25A Sec. 11c are now posted at the Energy Performance Contracting Program PageEnergy Performance Contracting Program Page