Listed below are solicitations with the Division of Capital Asset Management and Maintenance.

For more information on DCAMM solicitations, search for DCAMM at www.commbuys.com/bso/ 

Open Solicitations

Closing Date

HCC1301E ES1- Holyoke Community College -Energy Conservation Measures7/30/15 - 2:00 PM
DCP1546 AD1 Commonwealth of Massachusetts Energy Intelligence System7/31/15 - 2:00 PM
FAC91designated DCAMM Solar Array Inspection Services8/6/15 - 2:00 PM
BSD1401E-ES1 Bristol County Sheriffs Office, Energy Project, North Dartmouth and New Bedford8/17/15 - 2:00 PM

Recently Closed Solicitations & Awarded Projects
Name & Description

Award Recipient

Contact DCAMM
617-727-4030

University of Massaschusetts Lowell - UMass Lowell - Energy Design Build ProjectConstellation New Energy, Inc.Jeremy Caron
x 31479
For Equipment, Design, and Installation of New Boiler, Back Pressure Steam Turbine and Energy Conservation Measures for Massachusetts College of Liberal Arts, North AdamsAdams Plumbing and Heating, Inc.Dave Lewis
x 31472

SDE - Essex Sheriff's Dept. - Multisite - Energy & Water Retrofit - Construction

Project requires the design, installation, commissioning and maintenance of multiple energy and water conservation measures (ECMs). Measures include, but are not limited to, high efficiency condensing boilers, lighting upgrades, main switchgear replacement, water control measures, solar PV arrays and solar thermal.

J.C. Cannistraro, LLCJeremy Caron
x 31479

Equipment, Design, and Installation of Solar Thermal at Massachusetts Maritime Academy (Project # MMA1401E EC1)

The Commonwealth is interested in turnkey Proposals for design, equipment purchased and installation, balance of systems, permitting, interconnection, startup and commissioning, warranty services, and maintenance of a solar thermal system. Services are also requested for training in preventive maintenance and operation of the system.

Weston and SampsonKrista Lillis
x 31428

Request for Proposals for Energy Design Build for Middlesex House of Correction in Billerica

Project requires design, installation and commissioning of multiple energy conservation measures (ECMs). Measures include high efficiency condensing boilers, lighting upgrades, combined heat and power, transformer replacements, water control measures, Solar Thermal and Solar PV arrays.

NorescoMike Reinhardt
x 31234
Salem State University Energy Performance Contract (SSA1101-ES1)|
Comprehensive energy and water performance contracting services at Salem State University.
Constellation EnergyMike Reinhardt
x 31234

To be added to the distribution list to receive periodic e-mail notifications of updates or to edit your contact information, please e-mail Stephen White at stephen.white@state.ma.us. Unless specifically listed otherwise, you may contact Jenna Ide, Program Manager for the Energy Efficiency and Sustainable Buildings Group at DCAMM at jenna.ide@state.ma.us or (617) 727-4030 x31487.

The Model Audit Contract, the Model Energy Services Agreement (ESA) for Comprehensive Energy Projects and the Standard ESA for Equipment, Design and Installation for projects procured under M.G.L. Chapter 25A Sec. 11c are now posted at the Energy Performance Contracting Program Page Energy Performance Contracting Program Page