TRC0801 - Lowell Superior Court Access Improvements
| Project | FY2010 Bond Cap |
FY2010 Federal |
FY2010 ARRA Federal Stimulus |
FY2010 Accelerated Bridge Program |
FY2010 Third Party and Project Financed Bonds |
FY2010 Total |
|---|---|---|---|---|---|---|
| Lowell Superior Court Access Improvements |
500,000 | 0 | 0 | 0 | 0 | 500,000 |
This funds the study, design, and construction for repair of the existing handicapped ramp and to add a vertical lift as required by the Access Board, at the Lowell Superior Court. The scope will also include studying the feasibility of a "LULA" lift to provide access from the 1st to 2nd floor as required by the MAAB.