|
Sustainable Design Program Features
- Installing high efficiency HVAC equipment at most
DCAM managed construction and renovation sites
- Utilizing energy modeling to optimize HVAC designs
- Maximizing available utility rebates for high efficiency
equipment
- Specifying recycled content materials in many applications
- Developing 3rd party commissioning pilot program
to ensure that project design criteria for efficiency
and indoor environmental quality are achieved
- Implementing staff training program
- Conducting Life Cycle Analysis on all major building
projects
- Recommend LEED-certification as design requirement
|