Mass.Gov Logo
Mass.Gov Home Page State Agencies State A-Z Topic List
CZM Logo top Massachusetts Office of Coastal Zone Management
Search
Coastal Hazards Commission (CHC) Home

CHC Final Report
Table of Contents


CHC Final Report
(PDF, 1.1 MB)


Coastal Shoreline and Floodplain Management Program


CZM logo bottom
CZM Navigation Bar CZM Navigation Bar


Preparing for the Storm:
Recommendations for Management of Risk from Coastal Hazards in Massachusetts



Chapter 3 - Infrastructure Inventory

Table 2 - Rating system for the prioritization of coastal structure repair (modified after Bourne Consulting Engineering, 2006)
Priority Definition* Action Required
I None No landward structures or residential dwelling units present Consider long-term planning.
II Low Priority Landward structures present with limited potential for significant infrastructure damage. Consider for future project.
III Moderate Priority Landward structures present with potential for infrastructure damage and/or limited residential dwellings (<1 dwelling impacted/100 feet of shoreline). Consider for active project.
IV High Priority High-value landward structures present with potential for infrastructure damages and/or moderate density residential dwellings (1-10 dwellings impacted/100 feet of shoreline). Consider for next project.
V Immediate/ Highest Priority Critical landward structures present with potential for infrastructure damage and/or high-density residential dwellings. Conditions of structure may warrant emergency stabilization as failure may result in potential loss of property and/or life (>10 dwellings impacted/100 feet of shoreline). Consider for immediate action due to public safety and welfare issues.
* Based upon perceived immediacy of action and presence of potential risk to inshore structures if not corrected.

 
 

 
COASTAL ZONE MANAGEMENT
251 Causeway Street, Suite 800Boston, MA 02114
617-626-1200617-626-1240 (fax)
czm@state.ma.us
Contact Us
About Us
Site Policies