Anticipated Construction Activity Report

For week beginning Sunday 7/19/2009

  Paving Contract   (7am-3:30pm)  

TL Edwards Inc.

Lynn Fells Parkway

 

  Sidewalk Contract   (7am-3:30pm)       

Newport Construction, Inc.

Lynn Fells Parkway

  Fencing/Guardrail Contract    (8pm-5:00am nightly) 

D’Allesandro Corp.

Storrow Drive, Boston

  Bridge Repairs  (7am-3:30pm)  

J.F. White Contracting Corp   

Neponset River Bridge, Dorchester/Quincy

 

NEL Corp

Woods Drawbridge Repairs, Medford/ Everett

 

Unified Contracting Inc.

BU Bridge Sidewalk Repairs, Cambridge/Boston

 

SPS New England

Storrow Drive Tunnel Repairs, Boston  (9pm – 5am nightly)

 

SPS New England

Bowker Overpass Ramp H Repairs, Boston

 

New England Infrastructure

River Street Bridge at Mother’s Brook, Hyde Park

 

J F White Construciton

Craigie Drawbridge and Craigie Dam Bridge

 

Lech Walensa/Mount Vernon Street Bridge

 

Patten’s Cove Bridge

 

 

 Bridge Emergencies   (9pm-5am)

NEL Corp

 

 Bridge Maintenance   (3pm-11pm)

SPS New England

Casey Overpass

North Harvard Street Bridge (Storrow Drive)

Lars Anderson Bridge

Gilmore Bridge

 

Parkway/Seawall Reconstruction (7am-3:30pm)

CRC Construction

Nantasket Seawall Ramps and Railings Replacement, Hull

 

Catch Basin, Manhole & Drain Line Repairs (7am-3:30pm)

D&C Construction Corp.

Various Locations throughout all DCR districts

Catch Basin Repairs/Cleaning (7am-3:30pm)

Various locations throughout all DCR districts

 

Pavement Markings      (9pm-5:00am)

Hi-Way Safety Systems

None Scheduled

Tennis & Basketball Court Replacements     (7am-3:30pm) 

D&R Contracting Corp.

None Scheduled

 

 Park Construction      (7am-3:30pm)

 

WAC Contracting

Botume House Renovation, Stoneham

 

CRC Const Inc.

Ponkapoag Dam Rehabilitation

 

Metro Equipment, Inc

Magazine Beach Rehabilitation, Cambridge

 

CRC Inc.

Neponset River Esplanade, Quincy

 

Visitor’s Center and Tank, George’s Island

Modular Maintenance Building, George’s Island

Generator Building Renovations, George’s Island

Rinse-Off Facility, Spectacle Island

 

 Traffic Signal Maintenance      (24 Hours)

Coviello Electric Corp.

Repair of damaged traffic signal equipment throughout the DCR system as required

 

 Facility Lighting/Electrical Maintenance    (7am-3:30pm)

YES Corp

Electrical and electronic repairs to support operations – all Urban Regions

 

 Rink Repairs    (7am-3:30pm)

Refrigeration Engineering Co., Inc.

None Scheduled

 

 Pool Repairs    (7am-3:30pm)

The Aulson Company, Inc.

Pool Maintenance and Repair in Support of Pool Openings

Landscaping    (7am-3:30pm)

Northern Tree Service

None scheduled

 

Bridge Painting    (7am-3:30pm

Bowker Overpass, Boston

 

Plumbing Maintenance    (7am-3:30pm)

Irvine & Sons

Various locations throughout DCR areas of responsibility

 

Upcoming Projects

Short Beach Improvements, Revere/Winthrop

Houghton’s Pond Bath House Sewer Line, Canton

Mystic Dam Rehabilitation

Commissioner’s Landing

Nonantum Road Improvements

Watertown Square Improvements, Watertown

BU Bridge Rehabilitation

Cheney Bridge

Magazine Beach Pedestrian Bridge

Mystic Valley Parkway Bridge over Alewife Brook

Trestle/Charles River

Nahant Causeway Rehabilitation