Department of Conservation and Recreation

Anticipated Construction Activity Report

For week beginning Sunday 7/27/2008

  Paving Contract    

TL Edwards Inc.

Perkins Street, Boston

Spaulding and Main, Everett

  Sidewalk Contract   (7:00 AM – 3:30 PM)      

Tasco Construction

Lynn Fells Parkway

Memorial Drive

  Fencing/Guardrail Contract (7:00 AM – 3:30 PM)     

D’Allesandro Corp.

Longfellow Bridge

  Bridge Repairs (7am-3:30pm)  

J.F. White Contracting Corp   

Neponset River Bridge, Dorchester/Quincy

 

NEL Corp

Woods Bridge Repairs

 

Unified Contracting Inc.

BU Bridge Sidewalk Repairs

 

SPS New England

Storrow Drive Tunnel Repairs

 

SPS New England

Bowker Overpass Ramp H Repairs

 

River Street Bridge at Mother’s Brook

 

Bridge Emergencies   (9pm-5am)

NEL Corp

Longfellow Bridge, Boston/Cambridge

Storrow Drive Tunnel, Boston

 

 

Bridge Maintenance  

SPS New England

McGrath Highway

Casey Overpass

 

Bridge Painting   (9pm-5am)

Prime Coatings

None

Parkway/Seawall Reconstruction (7am-3:30pm)

S&R Construction

Quincy Shore Drive, Quincy

 

D’Allesandro Corp

Revere Beach Blvd, Revere

 

 

J.H. Maxymillian  Inc..

Mount Greylock Parkway Rehabilitation –Mt. Greylock State Park

 

Coviello Electric Corp.

Street Light Rehabilitation, Fellsway West

 

CRC Construction

Nantasket Seawall Ramps and Railings Replacement

 

GVW Incorporated

Concession Stand at Constitution Beach

 

D’Allesandro Corp

Rocky Beach Road Intersection Rehabilitation

 

Catch Basin, Manhole & Drain Line Repairs (7am-3:30pm)

D&C Construction Corp.

South Region – various locations

Catch Basin Repairs/Cleaning (7am-3:30pm)

National Water Main Corp & Rapid Flow Corp

None Scheduled

 

Pavement Markings      (9pm-5:00am)

Hi-Way Safety Systems

None Scheduled

Tennis & Basketball Court Replacements      

D&R Contracting Corp.

Admiral’s Hill, Chelsea

 

Park Construction      (7am-3:30pm)

 

E. A. Colangeli Corp.

Salisbury Beach Lifeguard Station, Salisbury Beach State Reservation

 

Chapman Waterproofing

Plymouth Rock Portico

 

D&C Construction

Chestnut Hill Recirculation System (Path) Rehabilitation

 

T Cooney Const Inc

Trailside Museum Renovations

 

Sandy Beach Playgrounds Rehabilitation

 

Botume House Renovation

Traffic Signal Maintenance      (7am-3:30pm)

Coviello Electric Corp.

Repair of damaged traffic signal equipment throughout the DCR system as required

 

 

 

Facility Lighting/Electrical Maintenance    (7am-3:30pm)

YES Corp

Electrical and electronic repairs to support operations – all Urban Regions

 

Rink Repairs    (7am-3:30pm)

Rink Maintenance and Repair in Support of Rink Closings

 

Pool Repairs    (7am-3:30pm)

The Aulson Company, Inc.

Painting and Caulking in Support of Pool Openings

 

Landscaping    (7am-3:30pm)

Tree Pruning, Various Locations

 

Plumbing Maintenance    (7am-3:30pm

Various locations throughout DCR areas of responsibility

 

Upcoming Projects

Magazine Beach Rehabilitation

Short Beach Improvements

Watertown Square Improvements

Houghton’s Pond Bath House Sewer Line