dcr band
-
 

Demonstration 3 Site Photos
Permeable Paving Materials and Bioretention in a Parking Lot

 
 

 

Monitoring

Silver Lake Rain Gauge

 

Monitoring Well Drilling

 

Monitor Well Installation

 

Monitoring Well

 

Well Sampling Setup

 

Pre-Installation and Construction

Pre-installation Parking Lot

Construction Begins

Site Grading

Pavers and Subsurface Installation

Permeable Pavers

Flexi-Pave Installation

Flexi-Pave Installation

Grass Swale Turf Mat

Newly Installed Bioretention Cell

 

Project Complete

 

Pavers

Pavers2

Pavers and Bioretention at Beach Entrance

Bioretention at Beach Entrance

Porous Asphalt Bioretention and Pavers

Bioretention

Pavers and Bioretention (photo by GeoSyntec)

Impervious Asphalt and Bioretention

Newly Installed Gravelpave

 

Flexi-Pave

Flexi-Pave

Flexi-Pave (foreground)

 

Vegetated Swales

Swale East

Swale West

 

 
-
-