|
Neponset River Dredge Spoils Project
Neponset River Dredge Spoils Assessment Results
April 2008
News Release: Testing of Soils Along Neponset River Finds Area Safe for Recreational Use Meetings to be Held in Hyde Park and Dorchester to Present Results to the Public Web page
Presentations on recent MassDEP sampling and evaluation of dredge spoils along the banks of the Neponset River. (Public meetings on April 28, 2008 and May 6, 2008): Introduction and Overview MS PowerPoint 53 KB | PDF 175 KB Sampling and Evaluation Results MS Powerpoint 1 MB | PDF 788 KB
Neponset River Dredge Spoils Assessment
December 2007 Presentation on Neponset River history, previous studies, objectives of sampling, data evaluation & path forward. PDF 3.6 MB
Sampling and Analysis Plan
Plan Text and Tables PDF 355 KB
Figure 1 Site Plan PDF 300 MB
Figure 2 1962 Spoil Area C PDF 3 MB
Figure 3 1962 Spoil Area D, 1962 Spoil Area E PDF 3 MB
Figure 4 1962 Spoil Area G, 1962 Spoil Area H, 1962 Spoil Area I0 PDF 3 MB
Figure 5 1964 Spoil Area A PDF 3 MB
Figure 6 1964 Spoil Area C PDF 3 MB
Appendix A MACTEC Standard Operating Procedures PDF 65 KB
Appendix B Soil Sample Field Data Record PDF 65 KB
Appendix C Sediment Sample Field Data Record PDF 350 KB
DCR Ryan Playground / Spoil Pile H Investigation Report
PDF 2 MB
News Release: Surface Soils to be Tested for PCBs along the Neponset River Banks in Boston and Milton, in Review of a 1960s-era Dredging Project
Web page |