The Official Website of the Massachusetts Department of Fish and Game

 
this is very small image to provide a space between the header and main content area
Marine Fisheries Logo Division of Marine Fisheries
keyword search:
Regulation Updates
Commercial Fishing
Quotas
Regulations
Licenses
Catch Reports
Recreational Fishing
Regulations
Recreational Permits
Species Profiles
elogbook
Salt Water Fishing Guide
Salt Water Fishing Derby
Public Access
Seafood & Bait Dealers
authorized dealers
dealer reporting
dealer regulations
Facilities and Properties
Contact Information
Publications
Newsletter
Technical
Informational
Marine Fisheries Notices
Public Hearing Notices
Advisories
Commission Neetings
jobs
FAQs
Links

Last Updated:
November 3, 2011
   
Programs and Projects
HubLine Program
 
Mitigation and Restoration
  Eelgrass Restoration
  Anadromous Fish Restoration
  Bottom Sediment Enhancement
  Shellfish Stock Enhancement
   
 
 
HubLine Impact Assessment, Mitigation, and Restoration
 
 

Eelgrass (Zostera marina) Restoration and Monitoring Technical Guidelines pdf icon

Massachusetts Marine Fisheries Hubline Mitigation Program Brochure pdf icon (1.6 Mb)

 
 
HubLine Map

Bruce Estrella Program Coordinator

The "HubLine" natural gas pipeline was constructed by Algonquin Gas Transmission Company in Massachusetts Bay during 2002-2003. This 29.4 mile long, 24" to 30" diameter pipe runs from Salem/Beverly to Weymouth and is buried at a minimum depth of 3 ft. with several exceptions. Horizontal directional drilling, conventional dredging, jetting, plowing, and blasting were all part of the construction process and collectively, they were assumed to have exerted an impact on the marine environment and living resources. Depending upon the type of equipment used, the area of disturbed sediments along the pipeline pathway caused by trenching and back-filling varied to as wide as ~70ft.

Specific Time-Of-Year (TOY) work windows were defined in the permitting process by the reviewing agencies in order to minimize the impact of construction activities on marine resources. The extension of work beyond the recommended TOY work windows end dates of 30 April 2003 and 31 May 2003 resulted in a Consent Order and Notice of Non-Compliance between the Department of Environmental Protection and Algonquin which defined compensation to the Commonwealth by Algonquin for mitigation and restoration for any short or long-term impacts to aquatic resources and habitat and for assessment.

lift barge
Barge laying pipeline.

The Massachusetts Division of Marine Fisheries (MarineFisheries) was designated as the lead agency with the responsibility to provide effective mitigation and/or restoration of aquatic resources and habitat in response to potential HubLine construction impacts.

A Marine Fisheries internal steering committee was chosen to provide intitial guidance to the HubLine mitigation and restoration program and a public process was implemented by November 2003 to solicit input on mitigation/restoration project ideas. We defined the public process to include a public announcement and comment period during October 28- November 28, 2003 and the creation of an Inter-Agency Steering Committee to seek input from interested stakeholders and relevant state and federal agencies.

 
 

-- top ^
 
 
 
 
Questions or comments
regarding this site
should be sent to
marine.fish@state.ma.us
Address Email DFWELE Privacy Policy Disclaimer