The Official Website of the Massachusetts Department of Fish and Game

 
Commonwealth of Massachusetts Riverways Program: Building Partnerships, Protecting Rivers
 About Riverways Newsletters Programs & Projects River Resources & Publications Watershed Contacts Volunteer Center Contact Us
Brook Trout photo by Tim Watts  Programs & Projects  Riverways Home
  
 Adopt-A-Stream
 RIFLS/Instream Flow
 River Continuity
 River Restoration
 Small Grants
 Stream Restoration Projects
Priority Projects summary
Priority Projects list
Technical Memos and Other Links
 Technical Assistance
 Urban Rivers
 Wild & Scenic Rivers

Stream Restoration Projects

The Riverways Program evaluates and undertakes stream restoration projects by partnering with local and regional river advocacy groups. Restoration projects follow an ecosystem-based subwatershed approach focusing on the factors that most impact river and stream health. Stream restoration projects that Riverways works on include: stream continuity and aquatic species passage projects such as dam removal and culvert replacement and retrofits; aquatic habitat improvement; stream daylighting; and urban stream revitalization.

Pilot Projects

Stream Town Type of Restoration
Bronson Brook Worthingon culvert replacement, culvert retrofit, bank bioengineering, woody habitat installation
Housatonic River Dalton Old Berkshire Mill dam removal
Labor-in-Vain Brook Somerset culvert replacement and habitat improvements
Minute Man National Historic Park tributary Lincoln daylighting and culvert replacement
Neponset River Boston, Milton river restoration
Ox Pasture Brook Rowley dam removal
Tower Brook Chesterfield culvert retrofit
Town Brook Plymouth Billington Street dam removal, Brewster Gardens stream bank restoration
Yokum Brook Becket Silk Mill dam removal and Ballou dam removal


Priority Projects (2005-2008)
for project descriptions click here

Stream Town Type of Restoration
Blackstone River Millbury dam removal
Coles Brook Washington aquatic habitat restoration
Eel River Plymouth small dam removal, coldwater habitat restoration, retired cranberry bog restoration
Galloway Brook Barre small dam removal
Green River Greenfield 2 dams removal
Jones River Kingston dam removal
North Branch Hoosic River Clarksburg aquatic habitat restoration
South Branch Hoosic River and Hoxie Brook Adams stream daylighting, flood channel habitat improvements
West Branch Housatonic River Pittsfield dam removal
Little River Gloucester stream channel restoration
Mill River Taunton aquatic habitat restoration and dam removals
North Nashua River Fitchburg urban stream revitalization
Red Brook Wareham small dam removals and aquatic habitat restoration
Shawsheen River Andover multiple dam removal
Swift River Belchertown and Ware stream restoration
Town Brook Plymouth stream channel improvement, small dam removals, stream daylighting
   
statewide map of restoration projects  
Project location map  
 
Tower Brook  
Tower Brook restoration  
   
Woody habitat  
Tree salvage during restoration at Red Brook, Wareham/Plymouth  
   
Taunton River  
Taunton River  
   
Yokum Brook  
Ballou Dam removal, Yokum Brook, Becket  
   
Tower Brook  
Galloway Brook streambank plantings, Barre  
   
Swift River  
Removing flow constriction on Swift River, Ware