The Official Website of the Massachusetts Division of Energy Resources (DOER)

Mass.Gov Home > EOEEA > DOER > Renewable Portfolio Standard >

Advisory Rulings


Advisory Rulings on the Likely RPS-Eligibility of Generation Units

The RPS Regulations at 225 CMR 14.06 (5) provide that the owner or operator of a generation unit may request an advisory ruling from DOER to determine whether the unit would qualify as a New Renewable Generation Unit.

The primary purpose of the Advisory Ruling provision is to afford the owner, operator, or developer of an existing, new, or proposed generation unit a means of assessing the likelihood and conditions under which the unit would qualify as a New Renewable Generation Unit under the RPS regulations prior to committing significant investment in time and/or expense for project development. This is especially useful in the case of a biomass unit, for which the RPS regulations include fuel, technology, and air emission criteria that DOER must interpret in its evaluation of each such unit.

Note that the actual, formal RPS qualification of a generation unit would be in the form of a Statement of Qualification from DOER. The unit's owner or developer would supply considerably more and certain detail in submitting an application for a Statement of Qualification. Also note that, for certain types of generation units, as listed in the RPS regulations at 225 CMR 14.06 (2) (b), DOER is required to provide an opportunity for public comment on an application for a Statement of Qualification. DOER may choose to provide such opportunity under other circumstances as well.

Below is a list of the Generation Units for which an Advisory Ruling has been completed. To access a copy of each ruling, click on its identification.

Date Generation Unit Identification Fuels and Technology
10/27/03 PSNH Schiller Station Unit 5, Portsmouth, New Hampshire Biomass (formerly coal), fluidized bed
1/6/04 EcoPower Biomass Power Plant, Massachusetts C&D wood and other eligible biomass, fluidized bed
3/9/04 Renewable Oil International Bio Oil by fast pyrolysis, generation technology to be determined
5/11/04 ABCDC's Brian J. Honan Apartments, Allston (Boston), Massachusetts 100% bio-diesel, internal combustion engine, combined heat and power - demo project
5/18/04 Northern Power System at Tractebel's Pinetree Station, Westminster, Massachusetts Landfill methane gas turbine, with possible steam cycle
6/17/04 Boralex Stratton Energy and Boralex Livermore Falls, Maine Re-tool one or the other of two stoker combustion biomass plants with fluidized bed
6/17/04 McNeil Station, Burlington, Vermont Re-tool a stoker combustion biomass plant with fluidized bed
7/8/04 Greenville Steam Co., Greenville, Maine Re-tool a stoker combustion biomass plant with fluidized bed
8/4/04 Biomass Energy Resource Center project at Heyes Forest Produts, Orange, Massachusetts Downdraft & biomass gasifier co-fueling a deisel generator, with combined heat & power - demo project
8/4/04 GenPower - two projects, Massachusetts and Rhode Island Bubbling fluidized bed fueled primarily by C&D wood
9/7/04 GenPower - two projects, Maine and New Hampshire Bubbling fluidized bed fueled by wood
12/30/04 Pinestate Power LLC's Barnstead Power & Light, Center Barnstead, New Hampshire New 4.8 MW electricity generation unit with a pair of Wellons gasifiers, fueled by C&D woody debris
1/7/05 Hemphill Power & Light, Springfield, New Hampshire Technology (Jansen overfire air system) for proposed 16 MW, wood-fired retooling project
4/7/05 Russell Biomass Power Plant, Russell, Massachusetts Proposed new 50 MW bubbling fluidized bed plant fueled by whole tree chips, C&D wood, etc.

DOER mini-logo

SEARCH


Search Tips