Go to Mass.gov home.
  • State Offices & Courts
  • State A-Z Topics
  • State Forms

No Active Alerts

  • Skip to main content
  • Need help resizing text?
The Official Website of the Department of Revenue (DOR)
Department of Revenue
  • About DOR

Main Menu

  • Individuals
  • The current page belongs to the main category of Businesses
  • Tax Professionals
  • All Taxes
  • Child Support
  • Local Officials
  • Tax Forms
  • E-Services

Breadcrumbs

  1. Home
  2. Businesses
  3. Programs & Services
  4. Underground Storage Tank Program
  5. UST Policies & Guidelines
  6. UST Guidelines

UST Guidelines

The following guidelines are applicable to work performed prior to September 1, 2007. Guidelines for work performed after September 1, 2007 are included in the workbook portion of the revised Appendix 3 Reimbursement Fee Schedule, which can be downloaded from the UST Regulations page.
  • Internal Control Manual pdf format of 			Internal Control Manual

  • Monthly EFR

  • Obtain Off-Site Access

  • Replacement Components

  • Document for Items Required to Be Bid

  • Field Coordination

  • On-Site Regeneration of Carbon Vessels

  • Trenching

  • NPDES Permit Exclusion Remediation Dewatering

  • Remediation Equipment Compound Fencing

  • Proof of Report Submissions

  • File Review Fees

  • Feasibility of Permanent Solutions; Feasibility of Restoration to Background

  • Minor Permit Modification Pursuant to 310 CMR 40.0725

  • Surveying with respect to Activity and Use Limitations

  • Public Involvement

  • Phase II Per 310 CMR 40.0830

  • Repair of System

  • DEP Requested Meetings

  • Update Health and Safety Plan

  • Excavated Soils Monitoring

  • Excavated Soils Management

  • Survey Calculations and Drafting

  • Concrete and Asphalt Patch

  • Piping and Conduits - Electrical

  • Installation of Utilities for Remediation Systems Only

  • Oversight with Respect to Drilling Activities

  • Performing Rising or Falling Head (Slug) Test

  • Equipment Mobilization and Demobilization

  • Geoprobe or Equivalent Device

  • Pre-drilling Activities

  • Air Knifing

  • Interceptor Trench and Utility Trench

  • Monitoring/Recovery Well Development

  • Laboratory Analysis

  • Remote Telemetry System with Software

  • Removal and Storage of Equipment

  • Phase II Addendum

  • Response Action Outcomes Pursuant to 310 CMR 40.1000

  • Risk Characterization Per 310 CMR 40.0900

  • Soil Vapor Extraction/Air Sparging Testing

  • Labor Categories

Complementary Content

Quick Links

  • UST Home Page
  • UST Contact Information
  • UST Forms
  • UST Regulations

© 2013 Commonwealth of Massachusetts.
Mass.Gov® is a registered service mark of the Commonwealth of Massachusetts.

  • Site Policies
  • Contact Us