Claim Submission Guidance Document

UST Board Approval Date - 2/26/04

Task Code 10.1.1 through 10.6
Monitoring/Recovery Well Development

This Task Code may be used for well development activities of newly installed wells or for the redevelopment of existing wells, regardless of the date the development occurred. This Task Code should not be used on a regular basis to remove water containing sediment prior to a sampling event.

Documentation must be provided that distinguishes between well installation time (drilling contractor), oversight time (consultant) and development time (either by drilling contractor or consultant). Field notes and invoices must document labor hours worked to develop wells and must identify which wells were developed. Reimbursement will be based on the actual number of hours spent/documented for developing wells. Hourly rate also includes all materials and equipment.

Field notes must be provided to support this activity.