Permeable Paving Materials and Bioretention in a Parking Lot

 

Monitoring

Silver Lake Rain Gauge        Monitoring Well Drilling

 

Monitor Well Installation        Monitoring Well

 

Well Sampling Setup


 

Pre-installation and Construction

Pre-Installation Parking Lot        Construction Begins

 

Site Grading        Pavers and Subsurface Installation

 

Permeable Pavers        Flexi-Pave Installation

 

Flexi-Pave Installation        Grass Swale Turf Mat

Newly Installed Bioretention Cell


 

Project Complete

Pavers        Pavers

 

Pavers and Bioretention at Beach Entrance        Bioretention at Beach Entrance

 

Porous Asphalt Bioretention and Pavers        Bioretention

 

Pavers and Bioretention        Impervious Asphalt and Bioretention

 

Newly Installed Gravelpave


 

Flexi-Pave

Flexi-Pave        Flexi-Pave


 

Vegetated Swales

Swale East        Swale West


 

Back to Demonstration 3 Permeable Paving Materials and Bioretention in a Parking Lot Project Page