LOCATION OF INJURY
 
Connecticut River in Holyoke, MA
 
DATE OF INJURY1852, 1990 and ongoing
 
DATE AND AMOUNT OF SETTLEMENT
 
2004 at $500,000
 
NRD SETTLEMENT FUNDS AVAILABLE$345,000
 
RESPONSIBLE PARTY
 
Holyoke Gas & Electric Department and Holyoke Water Power Company
 
NATURAL RESOURCE TRUSTEES
 
MA Executive Office of Energy and Environmental Affairs (EEA)
National Oceanic and Atmospheric Administration (NOAA)
U.S. Fish and Wildlife Service (USFWS)
 
RELEASE OF HAZARDOUS SUBSTANCES
 
Release of coal tar into the Connecticut River resulting from the manufacturing of combustible gas from coal for over 100 years
 
INJURED RESOURCES
 
Surface water, fisheries, rare freshwater mussels
 
RESTORATION STATUS
 
Restoration planning is ongoing
 
ADDITIONAL RESOURCES
 
Draft Restoration Plan/Environmental Assessment (RP/EA)
Connecticut River Watershed DRAFT Assessment Plan 2003 pdf format of    Connecticut River WQAR 2003  file size 5MB doc format of Connecticut River WQAR 2003 file size 3MB
NHESP Fact Sheet for Yellow Lampmussel
NHESP Fact Sheet for Shortnose Sturgeon
NHESP Fact Sheet for Tidewater Mucket

 

Holyoke Coal Tar Site (RTN 1-1055) NRD Case Settlement

In 2004, state and federal natural resource Trustees reached a settlement agreement with the Holyoke Gas & Electric Department and the Holyoke Water Company for natural resource damages in the amount of $345,000.

Natural Resource Trustees

Trustees for the Holyoke Coal Tar Site (RTN 1-1055) include the Massachusetts Executive Office of Energy and Environmental Affairs (EEA), National Oceanic and Atmospheric Administration (NOAA) and the U.S. Fish and Wildlife Service.

Site History

The former Gas Works in Holyoke manufactured combustible gas from coal and oil for residential, commercial, and industrial heating and lighting from 1852 to 1951. The former Gas Works once occupied a 2-acre peninsula on the Connecticut River 1500 feet downstream of the Holyoke Dam. Historic operations resulted in large releases of tar and oil to soil, groundwater, sediment, and surface water. In 1990, oil/tar was observed discharging into the Hadley Falls tailrace and reported to the Massachusetts Department of Environmental Protection (Mass DEP). The Gas Works utilized two types of manufacturing processes: coal carbonization and the carbureted water-gas process. Each process generated tar as a by-product, namely coal tar and carbureted water-gas tar. According to records research and calculations performed by Mass DEP, this manufactured gas plant ("MGP") produced approximately ten million gallons of MGP tar during its 100 years of operations.

Assessment and cleanup are required under the Massachusetts Contingency Plan (M.G.L. Chapter 21E) and Mass DEP provides oversight. The potentially responsible parties (PRPs), conducting the cleanup work, are the former owner/operators of the facility: Holyoke Water Power Company (HWP), owner/operator from 1852-1902, Holyoke Gas & Electric Department (HG&E), owner/operator from 1902-1952, and the City of Holyoke. Northeast Utilities Service Company, agent for HWP, is conducting the cleanup of tar deposits in the river (RTN 1-1055), and HG&E is conducting the cleanup of the upland area and the No.2 Raceway (RTN 1-816).

Between 2002 and 2006, 11,714 cubic yards of tar and tarry sediment were removed. The removal was accomplished using mechanical excavation in dry (dewatered) areas and in wet excavations where dewatering was impractical or not feasible. The work was performed during summer and fall months to avoid critical fish life cycles, migratory periods, and dangerous high flow conditions. Mussel and fish relocation were conducted to reduce exposures in work areas. The Massachusetts Natural Heritage and Endangered Species Program provided oversight to a mussel removal and relocation program that resulted in the relocation of 26,000 mussels between 2002 and 2005. Additional studies of the river contamination are on-going as overseen by Mass DEP.

Injured Natural Resources

Releases of MGP tar attributable to the Site have caused injuries to natural resources of the Connecticut River. The tar deposits exist in an area known to provide spawning habitat for the federally endangered short-nose sturgeon (Acipenser brevirostrum). Tar deposits also coexist in habitat for two state-protected mussel species, the Tidewater mucket (Ligumia ochracea) and Yellow lampmussel (Lampsilis cariosa), and numerous finfish and common mussel species.

Two types of MGP tar patches, "hard" and "soft," have been characterized in the vicinity of the Site. Both types of tar patches are inhospitable to burrowing benthic fauna, such as freshwater mussels, and to some epifauna that rely on coarser-textured substrates for shelter. A decrease in the benthic community produces a decrease in the foraging opportunities for other components of the ecosystem, such as finfish. In this manner, MGP tar patches produce ecological damage by destroying habitat for benthic organisms and for the organisms that depend on the benthic community as food.

Restoration Planning

The Massachusetts Department of Environmental Protection (MassDEP), the National Oceanic and Atmospheric Administration (NOAA), and United States Fish and Wildlife Service (USFWS) (the Trustees) are seeking public review/comment on the draft Restoration Plan (RP) and Environmental Assessment addressing natural resource injuries on the Connecticut River resulting from the Holyoke Coal Tar Deposits and Former Holyoke Gas Works. At the Holyoke Site, coal tar produced from a former manufactured gas plant was released to adjacent soil, groundwater, sediment, and surface water, including the Connecticut River. Tar deposits impacted aquatic habitat for benthic organisms as well as fish and freshwater mussels that utilize these river habitats. The Trustees reached a settlement with the Responsible Parties who agreed to pay the Trustees $345,000 to compensate for impacts to natural resources. As described in the RP, funds are being proposed to remove the Bartlett Rod Shop Company Dam, Pelham, MA to restore anadromous fish passage, restoration of fish passage and fishway installation at the Manhan River Dam, Easthampton, MA, and conduct endangered mussel surveys along portions of the CT River mainstem. A digital copy of the RP/EA can be downloaded from the NOAA web site http://www.darrp.noaa.gov. NOAA will accept public comments through January 31, 2012. For more information, contact James Turek, NOAA Restoration Center, 28 Tarzwell Drive, Narragansett, RI 02882; 401-782-3338; James.G.Turek@noaa.gov.

Holyoke Coal Tar Site Trustee Contacts

Mass Department of Environmental Protection
Brian.Harrington
413-755-2291
BrianD.Harrington@state.ma.us

National Oceanic and Atmospheric Administration
James Turek
401.782.3338
James.G.Turek@noaa.gov

U.S. Fish and Wildlife Service
Molly Sperduto
603.223.2541
Molly_Sperduto@fws.gov