1. Instructions: BRP WS 33 doc format of BRP WS 33 Instructions
pdf format of BRP WS 33 - Distribution Modifications <3300

  2. Form: BRP WS 33 doc format of BRP WS 33 - Distribution Modifications <3300
pdf format of BRP WS 33 - Distribution Modifications <3300

  3. Transmittal Form & Number for Permit Application & Payment


Permit Fact Sheet 

  1. What is the purpose of this approval?

    This approval serves to protect the public's health and welfare by insuring that minimum drinking water requirements are met in the modification of a drinking water distribution system, such as storage tanks, distribution pump stations, and transmission main installation. Legislative authority is stated in MGL Chapter 111, section 160A. Regulatory authority is stated in 310 CMR 22.04 of the Drinking Water Regulations.
  2. Who must apply?

    Public water suppliers or their representatives must apply if they want approval for modification of their distribution system.
  3. What other requirements should be considered when applying for this approval?

    If the water supplier or their representative apply for this approval it may be necessary to apply for other water treatment approvals BRP WS 23 or BRP WS 24.

    Note: Approvals of this type may require MEPA review. Please carefully examine 301 CMR 11.00, the MEPA Regulations, to determine if your project exceeds the MEPA review thresholds, or for more information contact the MEPA Unit of the Executive Office of Environmental Affairs (251 Causeway Street, Suite 900, Boston MA 02114 (617) 626-1020). MassDEP cannot begin technical review of the application until the MEPA process has been completed, unless otherwise agreed to in writing. Copies of MEPA filings (with reference to any applicable Transmittal numbers) should be sent to the appropriate program offices in Boston and the MEPA Coordinator in the appropriate Regional Office.

    Note: These additional requirements are intended to serve as a guide to the applicant. It does not necessarily include all additional requirements.
  4. What is the application fee?

    See
    Permit Application Timelines and Fees Schedule pdf format of Permit Application Timelines and Fees Schedule
.
  5. What is the Primary Permit Location?  What is the Reserve Copy Location?

    Primary Permit Location: 
    Department of Environmental Protection 
    __________* Regional Office
    Water Supply
    * Find Your Region

    Reserve Copy Location
    None Required.
  6. Where can I get a copy of the timelines?

    The timelines are available on the MassDEP Website: Permit Application Timelines and Fees Schedule pdf format of Permit Application Timelines and Fees Schedule
  7. What is the annual compliance fee?

    There is no annual compliance assurance fee for this permit.
  8. How long is this permit in effect?

    This approval is in effect as long as the modification continues to meet minimum drinking water standards and conforms to current Division of Water Supply guidelines and policies, described in Guidelines and Policies for Public Water Supply Systems, and available at the State Bookstore.
  9. How can I avoid the most common mistakes made in applying for this permit?

    a. Attach all material as requested on the Application Completeness Checklist.
    b. Submit fee and one copy of the MassDEP Transmittal Form to: Department of Environmental Protection, P.O. Box 4062, Boston, MA 02211.
  10. What are the regulations that apply to this approval?  Where can I get copies?

    These regulations include, but are not limited to:

      a.   Drinking Water Regulations, 310 CMR 22.00.

      b.   Timely Action and Fee Provisions, 310 CMR 4.00.

     These may be purchased online, in person, or by mail at the Massachusetts State Bookstore .