RC Planning Summary Form, Section B

Air Compressors
Air Handlers
Boilers
Building Cleaning Operations
Cafeteria
Chillers
Computers
Dock
Domestic Plumbing (restroom consumption such as toilets, urinals, showers, and faucets)
Employee Lounge
Equipment Maintenance
Fan Systems
Vehicles and Fleets
Furnaces
Process Heating and Cooling
Building Heating Ventilation and Air Conditioning Systems (HVAC)
Kitchen
Kitchen Plumbing (ice machines, food preparation, dishwashers, etc.)
Landscape Irrigation
Landscaping
Laundries
Lighting
Lunchroom
Motors
Office
Ovens
Pool
Printer, Copier or Fax Machines/Rooms
Process Heaters
Process Water (process cooling, rinsing operations, chemical dilution, waste pre-treatment)
Production Line
Pumps
Research and Development
Shipping/Receiving Areas
Spa
Stock Rooms
Other

For production operations not listed above, please check off the field listed other and refer to the TURA process codes available in Appendix H of the TURA Reporting Appendices doc format of    TURA Reporting Appendices  file size 2MB pdf format of TURA Reporting Appendices .