This page, Route 28 in Reading - Resurfacing and Road Diet Pilot, is part of
This page, Route 28 in Reading - Resurfacing and Road Diet Pilot, is offered by

Route 28 in Reading - Resurfacing and Road Diet Pilot

Resurfacing work will begin in March 2020 and the road diet pilot will run from Spring 2020 through Winter 2020/2021.

Main Street (State Route 28) in Reading needs to be repaved and restriped. As part of our work, MassDOT will test and evaluate a road diet to improve safety and access along the roadway. The resurfacing work and road diet pilot will take place on two state-owned sections of Main Street/ Route 28 from the North Reading town line to Charles Street and from the Ash Street train tracks south to the I-95 interchange.

Feedback