New classroom space includes robotics lab, machine shop, drawing studio, mixed media/sculpture studio, painting studio, computer graphics classroom and general purpose classrooms. The building features new café space, faculty offices and new student study spaces.
Project Details
Study and Project Designer: EYP Architecture & Engineering
Construction Manager: Eastern General Contractors
Project Type: Design/Bid/Build
Project Cost: $16,650,000
Gross Square Feet: 66,000 GSF
Substantial Completion Date: Summer 2015
Project Features
- New HVAC system including new air cooled chiller, air handler with energy recovery wheels and chilled beams in all classrooms and offices
- BIM was utilized for fire protection, plumbing HVAC and electrical coordination drawings