Plymouth County Correctional Facility – Energy Design Build

The project includes the final design, procurement, installation, and commissioning of various energy conservation measures.

Overview

plymouth county facility collage

Contractor: Thielsch Engineering, Inc.
Estimated Project Cost: $3,868,976
Estimated Annual Cost savings $520,054

Annual savings:

  • Electricity (kWh) - 2,267,647
  • Natural gas (therms, adding CHP) - 29,414
  • Water (gallons) – 27 million
  • CO2 (metric tons) – 1,100

Project goals:

  • Make the facility more energy and water efficient
  • Control water consumption

Project features

  • Outdoor lighting upgrades
  • Lighting controls for offices
  • Kitchen hood controls
  • Water flow control devices
  • 200kW cogeneration unit
  • Ventilation controls for the gym
  • Retro-commissioning
  • Ozone laundry system

Feedback

Did you find what you were looking for on this webpage? * required
We use your feedback to help us improve this site but we are not able to respond directly. Please do not include personal or contact information. If you need a response, please locate the contact information elsewhere on this page or in the footer.
We use your feedback to help us improve this site but we are not able to respond directly. Please do not include personal or contact information. If you need a response, please locate the contact information elsewhere on this page or in the footer.

If you need to report child abuse, any other kind of abuse, or need urgent assistance, please click here.

Tell us what you think