Overview
Contractor: Thielsch Engineering, Inc.
Estimated Project Cost: $3,868,976
Estimated Annual Cost savings $520,054
Annual savings:
- Electricity (kWh) - 2,267,647
- Natural gas (therms, adding CHP) - 29,414
- Water (gallons) – 27 million
- CO2 (metric tons) – 1,100
Project goals:
- Make the facility more energy and water efficient
- Control water consumption
Project features
- Outdoor lighting upgrades
- Lighting controls for offices
- Kitchen hood controls
- Water flow control devices
- 200kW cogeneration unit
- Ventilation controls for the gym
- Retro-commissioning
- Ozone laundry system