DYS - Middleton / Various locations - Solar and Lighting Upgrades

This project included design, installation, and support of commissioning and measurement and verification of a 100 kW DC rooftop solar array and LED lighting upgrades at various DYS facilities.

Project Details

Contractor:  Consigli
Project Type: Comprehensive
Gross Square Feet: 72,000
Est. Project Cost: $1,071,000
Est. Construction Substantial Completion Date: Winter 2022

Project Features

  • Design and installation of a solar photovoltaic array on the roof of DYS Middleton with a total capacity of 100 kW DC
  • LED lighting upgrades at DYS Middleton, Judge John J. Connelly Youth Center, Roslindale, and Allen Hall, Westborough
  • Energy Cost Savings: $55,088
  • Total Energy Savings in MMBTU: 1,158
  • Electric in kWh: 339,284
  • CO2 in Lbs.: 583

Contact   for DYS - Middleton / Various locations - Solar and Lighting Upgrades