MEMA Framingham Energy and Water Upgrades

This project included the replacement of the building management system, unitary HVAC equipment, air handling unit, and building generators. Work also included the installation of LED lights with occupancy sensors, exhaust and return fan motors, low flow water fixtures, variable volume air distribution with CO2 sensors, real time metering, and a solar canopy in the parking lot.

Project Details

MEMA

Design-Builder:  Ecosystem Energy Services
Project Cost: $5,600,000
Completed: 2021

Project Features

Energy Cost Savings: $225,000 annually

Contact

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback