MEMA Framingham Energy and Water Upgrades

This project included replacement of the building management system, unitary HVAC equipment, the air handling unit, and building generators. Work also included the installation of LED lights with occupancy sensors, exhaust and return fan motors, low flow water fixtures, variable volume air distribution with CO2 sensors, real time metering, and a solar canopy in the parking lot.

Project Details

MEMA

Contractor:  Ecosystem Energy Services
Project Type: Energy Design Build
Gross Square Feet: 35,625
Est. Project Cost: $6,488,120
Est. Construction Substantial Completion Date: Winter 2020

Project Features

  • ECM 1.01 Interior and Exterior Lighting LED replacement
  • ECM 2.01 Lighting controls
  • ECM 3.01 Replace Fan motors
  • ECM 4.07 & 4.10 Exhaust fan occupancy controls & BAS Upgrade
  • ECM 5.06 Domestic water fixtures
  • ECM 17.01-17.03 Replace HVAC Equipment, AHU, and Constant Volume Air Distribution
  • ECM 17.10 Demand Control Ventilation
  • ECM 19.00 Real Time Metering
  • ECM 21.01 PV Canopy 275 kW DC
  • ECM 23 Replace pumps and generators / demand response
  • Energy Cost Savings: $225,171 annually
  • Electric in kWh: 803,024
  • Therms of Gas/Barrels of Oil: 7,572