Project Details
Contractor: Ecosystem Energy Services
Project Type: Energy Design Build
Gross Square Feet: 35,625
Est. Project Cost: $6,488,120
Est. Construction Substantial Completion Date: Winter 2020
Project Features
- ECM 1.01 Interior and Exterior Lighting LED replacement
- ECM 2.01 Lighting controls
- ECM 3.01 Replace Fan motors
- ECM 4.07 & 4.10 Exhaust fan occupancy controls & BAS Upgrade
- ECM 5.06 Domestic water fixtures
- ECM 17.01-17.03 Replace HVAC Equipment, AHU, and Constant Volume Air Distribution
- ECM 17.10 Demand Control Ventilation
- ECM 19.00 Real Time Metering
- ECM 21.01 PV Canopy 275 kW DC
- ECM 23 Replace pumps and generators / demand response
- Energy Cost Savings: $225,171 annually
- Electric in kWh: 803,024
- Therms of Gas/Barrels of Oil: 7,572