Project Details
Project Type: CM at Risk
Est. Project Cost: $3,359,175
Designer: William Rawn Assoc. Architects Inc.
Est. Completion Date: Fall 2025
The initial step in this project is a feasibility study to develop the scope, conceptual design and implementation plan to replace the exterior curtainwall and revitalize the MassArt Tower Building at the heart of their campus on Huntington Ave in Boston.