Route I-195 to Route 18 Interchange Rehabilitation in New Bedford

Interstate 195 from Mt. Pleasant Street to the Route 18 Interchange is in poor condition and in need of repair and rehabilitation. The interchange was first constructed in 1965.

This area gets a high volume of traffic on a daily basis. I-195 carries over 75,000 vehicles daily from Route 140 to the I-195/Route 18 Interchange. Almost 36,000 vehicles daily use Route 18 between Coggeshall Street and Weld Street. Bicycle and pedestrian traffic interact with the interchange on adjoining local roads. The project area ramps carry almost 50,000 vehicles on and off the I-195 interchange per day.
Image credits:  MassDOT
Feedback