Massachusetts College of Art and Design - Tower Building Revitalization

The project will address the exterior envelope, associated HVAC systems, safety and code compliance issues as well as high priority critical repair of building systems that are reaching the end of their useful life.

Project Details

MassArt Tower Building

Project Type:  CM at Risk
Est. Project Cost: $1,559,175
Designer: William Rawn Assoc. Architects Inc.
Est. Completion Date: Fall 2024

The initial step in this project is a feasibility study to develop the scope, conceptual design and implementation plan to replace the exterior curtainwall and revitalize the MassArt Tower Building at the heart of their campus on Huntington Ave in Boston.