Water Street Bridges Replacement Project - Fitchburg
The Massachusetts Department of Transportation (MassDOT) is replacing two bridges along Water Street (Route 12) in the City of Fitchburg.
The bridge over the Nashua River and the bridge over Boulder Drive and the Pan Am Railroad are structurally deficient. They are scheduled to be replaced in 2024-2026 to continue safely carrying traffic through the City and the region.