Public Meeting Notice

Public Meeting Notice  Chelsea - Structural Cleaning & Painting, Steel & Concrete Repairs on Tobin Bridge

Tuesday October 24, at 6:00 p.m.

Address

Cafeteria, Williams Jr. High school, 180 Walnut Street, Chelsea, MA 02150

Overview   of Chelsea - Structural Cleaning & Painting, Steel & Concrete Repairs on Tobin Bridge

A Public Informational Meeting will be held by MassDOT to discuss the Structural Cleaning & Painting, Steel & Concrete Repairs on Tobin Bridge project in Chelsea, MA.

Purpose:

The purpose of this meeting is to provide the public with the opportunity to become fully acquainted with the Structural Cleaning & Painting, Steel & Concrete Repairs on Tobin Bridge project. All views and comments made at the meeting will be reviewed and considered to the maximum extent possible.

Project:

The project consists of location-specific cleaning and painting of the upper and lower section of the Maurice J. Tobin Bridge, the Beacon Street Ramp, and the Everett Avenue Ramp in Chelsea. The purpose is to clean, remove the existing paint system from the superstructure of the bridge, and repair steel and concrete as needed.

This location is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (including but not limited to interpreters in American Sign Language and languages other than English, open or closed captioning for videos, assistive listening devices and alternate material formats, such as audio tapes, Braille and large print), as available. For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580), fax (857-368-0602), TTD/TTY (857-368-0603) or by email (MassDOT.CivilRights@dot.state.ma.us). Requests should be made as soon as possible prior to the meeting, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, requests should be made at least ten (10) business days before the meeting. 

In the event of inclement weather, a cancellation announcement will be posted on this website. 

You will need   for Chelsea - Structural Cleaning & Painting, Steel & Concrete Repairs on Tobin Bridge

This meeting will be recorded and available for viewing online at a later date.

Additional Resources   for Chelsea - Structural Cleaning & Painting, Steel & Concrete Repairs on Tobin Bridge

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback