As envisioned by the decarbonization roadmap for the facility, this project electrifies a portion of the campus heating loads with the installation of an energy transfer loop, geothermal wells, and building-based water-source heat pumps in addition to implementing campus-wide energy conservation measures and improving the resiliency of the retrofit mechanical systems. The wellfield and energy transfer loop include future capacity for the campus.

Project Details

construction site

Contract Award Date: 8/21/2024
Commonwealth Consultant (Facility Advisor): Van Zelm Heywood and Shadford, Inc.
Prime Contractor: Bond Building Construction, Inc.
Estimated Total Project Cost (TPC): $39,000,000

 