Project Details
Contractor: Ameresco Inc.
Project Type: Energy Design Build
Gross Square Feet: 812,835
Est. Project Cost: $11,035,116
Est. Construction Substantial Completion Date: Summer 2020
Project Features
- ECM 4.09&4.1 Recommission/Expand Existing BMS Controls
- ECM 8.00 Radiator Valves
- ECM 9.00 Variable Frequency Drives
- ECM 10.00 Insulate Steam and Condensate Piping
- ECM 11.00 Vending and plug load controllers
- ECM 15.00 Chillers
- ECM 17.04 & 17.1 Air units and exhaust fans and demand control ventilation
- ECM 19.00 Real time metering – demand response
- ECM 22.00 Misc. specialty equipment
- ECM 24.00 General building code upgrades
- Energy Cost Savings: $436,386
- Total Energy Savings in MMBTU 14.788
- MMBTU Equivalent in homes heated/powered 22 homes
- Electric in kWh: 1,426,583
- Therms of Gas/Barrels of Oil: 992 Therms / 1,711 barrels
- CO2 in Lbs.: 1,010
- CO2 Equivalent in
- Trees: 168
- Cars: 217
Contact for Massachusetts College of Art and Design Campus Wide Energy/Water Retrofit
Online
Contact us by email
Email DCAMM Office of Energy & Sustainability at info.dcamm@mass.gov
Address
1 Ashburton Place, 15th Floor, Boston, MA 02108