Effective 5/1/2025
Tenant-based Units: Use the utility allowance for whichever is smaller, the size of the unit the family is leasing or the size allowed by their voucher.
Project-based Units: Apply the utility allowance for the unit size.
| Date published: | November 5, 2025 |
|---|