Guidance
Short term rental guidance for 1 & 2 family dwellings
Guidance for periodic inspections and sprinkler systems for short term rentals in 1 & 2 Family Dwellings per 780 CMR 10th Edition.
-
Open PDF file, 331.74 KB, Short Term Rental Guidance for 1 & 2 Family Dwellings (English, PDF 331.74 KB)
Mini-split permit and CSL guidance for 1 & 2 family dwellings
Guidance for permitting and the CSL requirements of ductless mini-split systems installed in 1 & 2 family dwellings per 780 CMR 10th Edition.
-
Open PDF file, 172.85 KB, Minisplit Permitting and Licensing Guidance for 1 & 2 Family Dwellings (English, PDF 172.85 KB)
Education
Updates to the Existing Building Code – 780 CMR Ch. 34 10th Edition
An education and training document used for District Meetings on the Existing Building Code and 780 CMR Ch 34 10th Edition. This document covers how to use this section of the code, how it interacts with 780 CMR 10th Edition, and an overview of the different compliance methods.
-
Open PDF file, 200.01 KB, Existing Building Code Updates, 780 CMR, Chapter 34, 10th-Edition (English, PDF 200.01 KB)
-
Open PDF file, 521.1 KB, BBRS Official Interpretations regarding 780 CMR 34 (English, PDF 521.1 KB)
Other State Agency Resources
Other state agencies of the Commonwealth of Massachusetts also provide education and training that covers parts of or works in tandem with 780 CMR 10th Edition. OPSI will cross-post the education materials as they are posted.
State Agency Links
Department of Conservation & Recreation Floodplain Management Training Calendar
Disclaimer
DOL/OPSI provides these documents as guidance resources only and not official interpretations or directives. Each building official is responsible for enforcement of 780 CMR within their jurisdiction. Questions about specific projects or specific code sections should be directed to the municipal or state building official having jurisdiction.
Contact
| Last updated: | December 30, 2025 |
|---|