Contractor: Ameresco, Inc.
Project Type: Ch. 25A SEC. 11c (Energy DB)
Est. Project Cost: $737,778.69
Est. Construction Substantial Completion Date: Fall 2022
Project Features
- ECM 21.01 Solar Pv Modules
- The current single inverter will be removed, disposed of, and replaced with multiple inverters.
- Racking will be reused.
- Balance of system components will be reused or replaced.
- Energy Cost Savings: $118,110 electricity avoided, $257,760 solar incentives
- Total Energy Savings in MMBTU: 2371
- Electric in kWh: 694,765 kWh will be produced annually
- Therms of Gas/Barrels of Oil: N/A
- CO2 in Lbs.: Project controls complete694,765*0.504=350,161.56 lbs CO2
- CO2 Equivalent in
- Cars : 49 cars