Wrentham Development Center – Solar Panel Replacement

Removal and disposal of 1672 ground mounted PV panels and the installation of a combination of warranty replacement panels and newly purchased panels to provide a total of 501 kW DC.

Project Details

aerial view

Contractor:  Ameresco, Inc.
Project Type: Ch. 25A SEC. 11c (Energy DB)
Est. Project Cost: $737,778.69
Est. Construction Substantial Completion Date: Fall 2022

Project Features

  • ECM 21.01 Solar Pv Modules
  • The current single inverter will be removed, disposed of, and replaced with multiple inverters.
  • Racking will be reused.
  • Balance of system components will be reused or replaced.
  • Energy Cost Savings: $118,110 electricity avoided, $257,760 solar incentives
  • Total Energy Savings in MMBTU: 2371
  • Electric in kWh: 694,765 kWh will be produced annually
  • Therms of Gas/Barrels of Oil: N/A
  • CO2 in Lbs.: Project controls complete694,765*0.504=350,161.56 lbs CO2
  • CO2 Equivalent in
    • Cars : 49 cars

 

Contact   for Wrentham Development Center – Solar Panel Replacement