- This page, Athol - Bridge Replacement, Route 2A/Main Street over G&W Railroad, is offered by
- Highway Division
- Massachusetts Department of Transportation
Public Meeting Notice Athol - Bridge Replacement, Route 2A/Main Street over G&W Railroad
Overview
A Virtual Public Informational Meeting will be hosted on the MassDOT website below to present the design for the proposed project in Athol, MA.
Purpose:
The purpose of this meeting is to provide the public with the opportunity to become fully acquainted with the proposed project. All views and comments submitted in response to the meeting will be reviewed and considered to the maximum extent possible.
Proposal:
The proposed project consists of a full bridge replacement to meet current standards, increase horizontal clearance from the existing railroad tracks, and provide bicycle accommodations consisting of (2) 5’ bicycle lanes in accordance with applicable design guides.
This meeting is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (e.g interpreters in American Sign Language and languages other than English, live captioning, videos, assistive listening devices and alternate material formats), as available. For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580), TTD/TTY at (857) 266-0603, fax (857) 368-0602 or by email (MassDOT.CivilRights@dot.state.ma.us). Requests should be made as soon as possible and prior to the meeting, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, requests should be made at least ten business days before the meeting.
This meeting will be hosted, or a cancellation announcement posted, on this website.