Massachusetts State Seal An official website of the Commonwealth of Massachusetts Here's how you know

Official websites use .mass.gov

A .mass.gov website belongs to an official government organization in Massachusetts.

Secure websites use HTTPS

A lock icon or https:// means you've safely connected to the official website. Share sensitive information only on official, secure websites.

Public Meeting Notice

Public Meeting Notice  BBRS 11th Edition Residential Code Subcommittee Meeting- 8.6.26

Meeting start time: 9:00am
Posted: August 3, 2026 9:59 a.m.

Overview

This is a remote meeting. You can participate from your computer, laptop, or smartphone. See the Meeting Agenda for details.

You will need

Microsoft Teams meeting link 

Meeting ID: 287 883 695 496 551 

Passcode: iu7x4AG7 

Need help? | System reference 

Dial in by phone 

+1 857-327-9245,,863864959# United States, Boston 

Find a local number 

Phone conference ID: 863 864 959#

In accordance with the provisions of G.L. c. 30A § 20, notice is hereby given that the Board of Building Regulations and Standards 11th Edition Residential Code Subcommittee will be convening a regular meeting. 

If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.

Meeting Minutes

Meeting Minutes – BBRS Residential Code Committee

In accordance with the provisions of G.L. c. 30A § 20, the Board of Building Regulations and Standards Residential Code Committee convened a regular monthly meeting on:

Microsoft Teams Meeting August 6th, 2026

The topics shown below were discussed at the aforementioned meeting: 9:04 AM Chair Becca Edson called the open meeting to order.

Informational note: All votes were taken by roll call. Where each member voted in favor, the vote will be reported as unanimous.

Committee Members Present:

  • Becca Edson
  • Todd Cantor 
  • Reade Milne
  • Len Morse-Fortier (left meeting at 11:00 AM)
  • David Riquinha
  • Ross Seavey

Committee Members Absent:

  • Jason Ferschke
  • Greg Gagnon
  • David Silveira 

DOL Staff Present:

  • Tammy Gropman, Executive Director
  • Charles Kilb, Senior Board Counsel
  • Andrew Chase, Associate Executive Director
  1. Review/Discuss/Vote Meeting Minutes 
  2. June 18, 2026 – It was noted that the meeting minutes were not available for review.
  3. Review/Discuss/ Vote IRC and 780 CMR 51.00 Chapter Reviews 
  4. 2024 IRC Appendix BI
  5. Members reviewed 2024 IRC Appendix BI, formerly Appendix AR, and discussed whether Massachusetts should continue to reserve the appendix or adopt provisions establishing a code-compliant path for light straw-clay construction. Members questioned whether reserving the appendix solely because it had not been adopted in the prior edition provided sufficient justification. Members noted that the construction method is used in Massachusetts, may support net-zero construction through recycled and locally sourced materials, and has been evaluated through the ICC code-development process. Members also compared light straw-clay construction with straw-bale construction, noting that light straw-clay generally functions as infill and may have lower R-values than straw-bale construction.
  6. Members generally supported moving toward adoption but raised concerns regarding structural review, unfamiliarity with the construction method, insulation and energy-code coordination, moisture performance, and consistency with other Massachusetts requirements. Members considered requiring the design to be stamped by a registered design professional and discussed whether the requirement should apply to all light straw-clay construction rather than only structures in specified seismic design categories. It was agreed that proposed front-end amendment language would be prepared, including a design-professional requirement and identification of any provisions needing Massachusetts-specific revisions.  No action taken.
  7. 2024 IRC Appendix BJ
  8. Members reviewed 2024 IRC Appendix BJ, formerly Appendix AS, and noted that Massachusetts adopted the prior edition of the straw-bale construction appendix in full. Members briefly discussed the use of straw-bale construction in Massachusetts and distinguished the system from light straw-clay construction by noting that straw-bale construction may form a structural and thicker thermal assembly.
  9. Becca Edson motioned to to adopt 2024 IRC Appendix BJ unamended, seconded by Ross Seavey. A roll call vote was held, none opposed, none abstained. David Riquinha was not present for the vote. Motion passed with majority.
  10. 2024 IRC Appendix BO
  11. Members reviewed 2024 IRC Appendix BO, formerly Appendix AJ, and discussed the substantially revised and streamlined approach taken by the 2024 IRC. Members considered whether prior Massachusetts amendments should be carried forward or whether Appendix BO should instead be evaluated as a new framework under which repairs, alterations, additions, and relocations comply with the requirements for new construction except as specifically modified by the appendix.
  12. Members discussed the removal of former Appendix AJ provisions addressing multiple categories of work and the 12-month lookback period in AJ101.3. Concern was raised that eliminating the lookback could allow work to be divided among multiple permits to avoid code triggers. Other members noted that the lookback may have limited relevance to one- and two-family construction because requirements to improve portions of an existing building generally arise in specific areas such as flood protection, energy conservation, and smoke alarms. Members agreed that the prior language should not be carried forward without first determining which code requirements still depend on a cumulative-work period and whether those requirements are addressed elsewhere, including Chapter 1, Chapter 3, the energy code, or flood provisions.
  13. Members discussed the removal of the former 50-percent work-area concept and clarified that substantial improvement primarily affects flood and energy requirements rather than creating a general obligation to bring an entire existing dwelling into compliance with the current code. Members emphasized retaining the opening provision of BO101.1, which requires repairs, alterations, additions, and relocations to comply with the code for new construction except as modified by Appendix BO. Members also discussed whether BO101.1 or another provision should expressly address the conversion of unconditioned space to conditioned space.
  14. Members discussed whether an existing-building evaluation or code analysis should be required for larger, unique, or complex projects, and noted that such evaluations can identify structural, life-safety, fire-protection, occupancy, and other code implications before work is enclosed. Potential thresholds included projects requiring construction control or a registered design professional, including buildings exceeding 35,000 cubic feet, while members also noted that complex projects can fall below that threshold. Members discussed whether the authority to require an evaluation already exists in Chapter 1 or through reference to the IEBC and agreed that the relevant provisions should be verified before adding duplicative language.
  15. Members raised concerns regarding structural loading when energy upgrades reduce heat loss and cause roofs to retain more snow. Members discussed whether Appendix BO should require evaluation of existing roof framing and connections when insulation or other alterations increase loading or change a space from unconditioned to conditioned. Members compared this issue with existing requirements for evaluating roof capacity when solar equipment is installed and considered revising the structural compliance language to cover structural elements and systems that are altered, repaired, replaced, or subjected to additional loads. Members also cautioned against creating an unnecessary administrative burden for minor insulation work.
  16. Members reviewed the prior Massachusetts provisions for unsupported masonry parapets and discussed their history, including failures in older communities and risks associated with wind and seismic forces. Members supported retaining an appropriate parapet provision, subject to review for consistency with the 2024 code.
  17. It was agreed that Appendix BO would be revised for continued review, with attention to flood, energy and smoke-alarm triggers; existing-building evaluations; structural effects associated with energy upgrades and changes to conditioned space; unsupported parapets; the discontinued term “reconstruction”; and the need to avoid carrying forward amendments that are redundant under the streamlined 2024 framework.
  18. 2024 IRC Chapter 3
  19. Members began reviewing the proposed Massachusetts amendments to 2024 IRC Chapter 3. Members supported retaining a reference to the American Wood Council deck-construction guidance but recommended omitting a direct website address because links contained in prior editions have become inactive.
  20. Members reviewed the Massachusetts requirement for professional engineering and construction control for buildings exceeding 35,000 cubic feet of enclosed space. Members discussed whether the provision is necessary in Chapter 3, whether it is addressed in Chapter 1, and how the threshold applies to individual townhouse buildings. The relationship between this provision and a possible requirement for an existing-building evaluation was also noted for further review.
  21. Members reviewed Table R301.2, Climatic and Geographic Design Criteria, and related Massachusetts tables containing municipal snow-load and wind-speed values. Members noted that tables must be provided in an accessible, screen-readable format rather than inserted as images. Board staff discussed possible standardization of wind speeds by geographic or climate region and the differences between current Massachusetts values and ASCE 7-22. Staff noted that ASCE 7-22 revised snow-load methodology from a uniform-hazard approach to a uniform-risk approach and that the resulting values could substantially increase design snow loads. 
  22. Members discussed R301.2.1 and related wind provisions, including the distinction between wind speed and ultimate design wind speed, the historical relationship to allowable-stress and load-and-resistance-factor design, and prior Massachusetts interpretations concerning windborne-debris glazing. Becca Edson motioned to delegate R301 to the Structural Advisory Committee, seconded by Ross Seavey. A roll call vote was held, none opposed, none abstained. Motion passed unanimously. 
  23. Members reviewed fire-resistant construction provisions and Massachusetts references to NFPA 13D and specialty codes. Members discussed removing sentences that independently direct electrical installations to comply with 527 CMR 12 because electrical enforcement is addressed through Chapter 1 and is outside the building official’s authority. Members supported retaining amendments necessary to regulate penetrations of fire-resistance-rated assemblies and residential sprinkler systems. Members also supported retaining the express reference to knob-and-tube wiring because the condition remains common in older dwellings and the prior amendment was adopted following a fatal incident.
  24. Members reviewed the flood-resistant construction provisions formerly located in R306 and reorganized as R322 in the 2024 IRC. Members considered language previously approved through the Climate Resiliency committee review. Reade Milne motioned to take defer Section R306 to the work completed by the Climate Resiliency committee, seconded by Becca Edson. A roll call vote was held, none opposed, none abstained. Todd Cantor was not present for vote. Motion passed unanimously.
  25. Members reviewed R308, Site Address, and discussed whether the section should retain references to M.G.L. c. 148, § 59 and 527 CMR. Members raised concerns that responsibility for assigning addresses varies by municipality and may rest with a building department, engineering department, fire department, or another local entity. Members also questioned whether the building code should direct a building official to enforce requirements administered under other laws or regulations. Legal counsel noted that the section can be deleted if the building official has no duties under 780 CMR, but advised caution.  Further review will determine whether 527 CMR contains the necessary address-size and visibility criteria, whether the building official has an enforceable role, and whether R308 should be retained, presented as a note, reserved, or deleted. 
  26. Chapter 3 review concluded before reaching R309 and the remaining provisions. Members agreed to continue the Chapter 3 review at a subsequent meeting.
  27. Discuss Matters Not Reasonably Anticipated 48 Hours in Advance of the Meeting
  28. Members discussed items to be included in future agendas, including the remaining sections of Chapter R3, Chapter R1, short-term rentals, and additional Code Change Proposals
  29. Adjournment – The next meeting is scheduled for September 3rd, 2026
    1. Reade Milne motioned to adjourn, seconded by Becca Edson. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
    2. Meeting adjourned at 11:22 AM.

Items Relied Upon

  • Meeting Agenda
  • Meeting Minutes
  • 2024 IRC
  • 780 CMR provisions

Agenda

Members
Becca Edson
Todd Cantor
Jason Ferschke
Greg Gagnon
Reade Milne
Len Morse-Fortier
David Riquinha
Ross Seavey
David Silveira

It is anticipated that the topics shown below will be discussed at the aforementioned meeting: 

  1. Review/Discuss/Vote Meeting Minutes 
    1. June 18, 2026 
  2. Review/Discuss/ Vote IRC and 780 CMR 51.00 Chapter Reviews 
    1. 2024 IRC Appendix BI
    2. 2024 IRC Appendix BJ
    3. 2024 IRC Appendix BO
    4. 2024 IRC Chapter 3
  3. Discuss matters not reasonably anticipated by the chair, 48 hours in advance of the meeting

Adjournment – the next scheduled meeting is September 3, 2026

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback