Public Meeting Notice BBRS Energy Advisory Committee Meeting - 8.24.26
Overview
This is a remote meeting. You can participate from your computer, laptop, or smartphone.
You will need
Microsoft Teams meeting link and dial-in number
Meeting ID: 225 222 987 482 492
Passcode: t88Xn6jH
Dial in by phone
+1 857-327-9245,,100440378# United States, Boston
Phone conference ID: 100 440 378#
In accordance with the provisions of G.L. c. 30A § 20, notice is hereby given that the Board of Building Regulations and Standards 11th Edition Energy Advisory Subcommittee will be convening a regular meeting.
If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.
Meeting Minutes
In accordance with the provisions of G.L. c. 30A § 20, the Board of Building Regulations and Standards Energy Advisory Committee convened a regular monthly meeting on:
Microsoft Teams Meeting August 24th, 2026
The topics shown below were discussed at the aforementioned meeting: 10:02 AM Chair Ian Finlayson called the open meeting to order.
Informational note: All votes were taken by roll call. Where each member voted in favor, the vote will be reported as unanimous.
Committee Members Present:
- Ian Finlayson - Chair
- Rebecca Ansolabehere
- Michael Browne
- Nathan Darling
- Paulette McGhie
- Brianna Skowyra (joined at 10:09 AM)
Committee Members Absent:
- Tarica Leskiw
- Vineet Nair
- Rebecca Rahmlow
DOL Members Present:
- Tammy Gropman, Executive Director
- Charles Kilb, Senior Board Counsel
Acknowledged Public Attendees:
- Shilpa Surana, DOER
- Sarah Newman
- Reviewed, Discussed, and Voted Minutes of the following Energy Advisory Meetings:
- July 27th, 2026 – Nathan Darling motioned to approve meeting minutes, seconded by Michael Brown. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- August 10th, 2026 – Nathan Darling motioned to approve meeting minutes, seconded by Paulette McGhee. A roll call vote was held, none opposed, Mike Browne abstained. Motion passed with majority.
- Review/Discuss/Vote Code Change Proposal Forms and Front-End Amendments
- IECC 2024 C403
- Members continued review of the proposed front-end amendments to 2024 IECC C403, Mechanical Systems, with substantial discussion focused on dedicated outdoor air systems (DOAS), energy recovery, and duct-system testing. Members reviewed a proposed table establishing occupancy-specific applicability and exemptions for dedicated outdoor air systems and energy recovery systems. The proposed table was based on provisions used in the 2021 Washington State Energy Code and was intended to refine the previously proposed Massachusetts requirement by identifying occupancies where DOAS and energy recovery would be practical.
- Members discussed Assembly Group A occupancies and raised concerns regarding uses that were identified in the underlying occupancy classifications but were not expressly addressed in the proposed table. The table title was revised to clarify that it applied to dedicated outdoor air systems and energy recovery systems, and the Group A-2 provision was revised to identify “all other A-2 occupancies” as exempted rather than leaving some uses unaddressed. Members discussed the practical basis for exemptions, particularly spaces with unusually high, variable, or process-driven outdoor-air requirements, including restaurants, commercial kitchens, cafeterias, animal facilities, and certain assembly uses.
- Members also revisited the energy recovery requirements and discussed applications in which dehumidification needs are addressed through other means. Members considered whether the minimum latent or enthalpy recovery requirement should apply where dehumidification needs are otherwise mitigated. The proposed amendment was revised to provide an exception where dehumidification needs are otherwise mitigated and the condition is approved by a registered design professional. Members confirmed that “registered design professional” is a defined term applicable within 780 CMR and discussed applying the same exception to the corresponding requirements for spaces other than non-transient dwelling units.
- Members further discussed duct leakage testing under C403.14.2.4 and raised concerns regarding reliance on SMACNA testing methods that may test only portions of ductwork rather than the complete system. Members considered an alternative based on ENERGY STAR Multifamily New Construction requirements for central exhaust systems, including testing representative portions of different ductwork sections such as risers, mains, branches, takeoffs, and register boxes. The proposed language was revised to clarify testing of representative sections of all types of ductwork totaling not less than 25 percent of the duct area and to provide an alternative compliance path for duct-system testing in accordance with the applicable ENERGY STAR Multifamily New Construction provisions. Members discussed whether the alternative should apply to supply and exhaust systems and determined that the referenced section aligned with the exhaust-system requirements addressed by C403.14.2.4.
- Nathan Darling motioned to approve section C403 as amended, seconded by Rebecca Ansolabehere. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Nathan Darling motioned to approve C403 code change proposal form, seconded by Brianna Skowyra. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Nathan Darling motioned to approve section C403 as amended, seconded by Rebecca Ansolabehere. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members further discussed duct leakage testing under C403.14.2.4 and raised concerns regarding reliance on SMACNA testing methods that may test only portions of ductwork rather than the complete system. Members considered an alternative based on ENERGY STAR Multifamily New Construction requirements for central exhaust systems, including testing representative portions of different ductwork sections such as risers, mains, branches, takeoffs, and register boxes. The proposed language was revised to clarify testing of representative sections of all types of ductwork totaling not less than 25 percent of the duct area and to provide an alternative compliance path for duct-system testing in accordance with the applicable ENERGY STAR Multifamily New Construction provisions. Members discussed whether the alternative should apply to supply and exhaust systems and determined that the referenced section aligned with the exhaust-system requirements addressed by C403.14.2.4.
- Members also revisited the energy recovery requirements and discussed applications in which dehumidification needs are addressed through other means. Members considered whether the minimum latent or enthalpy recovery requirement should apply where dehumidification needs are otherwise mitigated. The proposed amendment was revised to provide an exception where dehumidification needs are otherwise mitigated and the condition is approved by a registered design professional. Members confirmed that “registered design professional” is a defined term applicable within 780 CMR and discussed applying the same exception to the corresponding requirements for spaces other than non-transient dwelling units.
- Members discussed Assembly Group A occupancies and raised concerns regarding uses that were identified in the underlying occupancy classifications but were not expressly addressed in the proposed table. The table title was revised to clarify that it applied to dedicated outdoor air systems and energy recovery systems, and the Group A-2 provision was revised to identify “all other A-2 occupancies” as exempted rather than leaving some uses unaddressed. Members discussed the practical basis for exemptions, particularly spaces with unusually high, variable, or process-driven outdoor-air requirements, including restaurants, commercial kitchens, cafeterias, animal facilities, and certain assembly uses.
- Members continued review of the proposed front-end amendments to 2024 IECC C403, Mechanical Systems, with substantial discussion focused on dedicated outdoor air systems (DOAS), energy recovery, and duct-system testing. Members reviewed a proposed table establishing occupancy-specific applicability and exemptions for dedicated outdoor air systems and energy recovery systems. The proposed table was based on provisions used in the 2021 Washington State Energy Code and was intended to refine the previously proposed Massachusetts requirement by identifying occupancies where DOAS and energy recovery would be practical.
- IECC 2024 Commercial Chapter 5
- Members reviewed the proposed amendments to Chapter 5, Existing Buildings. Under C501.2, members reviewed amendments removing references to model codes not adopted by Massachusetts and replacing the ASHRAE 90.1 compliance reference with the applicable alternative compliance pathway. Members reviewed changes to C502 governing additions, including clarification of the applicable compliance pathways and modifications to the additional energy efficiency requirements. Members discussed the proposed 20,000-square-foot threshold for additions subject to additional efficiency measures, compared with the substantially lower threshold in the 2024 IECC. Members considered the effect of the change on smaller existing-building projects and noted that the proposed threshold would reduce compliance complexity for those projects. Members also reviewed the renewable energy requirements applicable to additions and discussed how the requirement would be based on the addition and remain subject to the exceptions contained in the referenced renewable energy provisions.
- Members reviewed the proposed C503 alterations provisions, including changes to insulation requirements for existing roof, wall, and floor assemblies. Members discussed replacing language concerning roof replacement with an exception for construction where an existing roof, wall, or floor cavity is not exposed. Members also reviewed amendments eliminating provisions considered unclear regarding limiting conditions and reports from registered design professionals. For above-grade wall alterations, members reviewed language requiring newly created cavities to comply with C402.1 and permitting exposed existing cavities to be filled with insulation having a value of not less than R-4 per inch.
- Members discussed the application of C403 requirements to alterations, including an exception from C403.7.4, Dedicated Outdoor Air Systems and Energy Recovery Systems. Members raised questions regarding whether an extension of an existing duct system constituted a “new” duct system. Members distinguished between installation of a new heating, cooling, and duct system and extension or reuse of an existing system and determined that no additional amendment was needed to the base language.
- Members then reviewed C503.6 and proposed Table C503.6 governing additional energy efficiency measures for substantial alterations to buildings greater than 20,000 square feet. Members discussed the proposal to simplify the 2024 IECC credit structure by requiring one qualifying measure rather than maintaining multiple point-based tables. Members reviewed the proposed air-leakage option, which would permit a whole-building leakage rate of 0.70 cfm/ft² at 0.3 inches water column (75 Pa), approximately twice the proposed new-construction leakage limit. Members raised concerns regarding multifamily dwelling-unit testing and discussed providing a corresponding testing-unit option. The language was revised to permit testing-unit air leakage of 0.60 cfm/ft² at 0.2 inches water column (50 Pa) based on the testing unit enclosure area and in accordance with the applicable testing provisions.
- The chair briefly opened the floor to a member of the public, Sarah Newman, who wished to address the committee regarding proposed Table C503.6 and, specifically, the inclusion of C406.3.4, Automated Shading. Concerns were raised that automated shading could produce substantially different energy savings depending on existing fenestration performance, orientation, location of shading devices, system operation, and other existing-building conditions. Members reviewed C406.3.4 and discussed the distinction between exterior automated shading and the lower-cost interior shading option that receives partial credit under the 2024 IECC. Members considered removing automated shading entirely from Table C503.6 but concluded that exterior automated shading could provide meaningful energy savings in appropriate existing buildings. Members therefore discussed revisiting C406.3.4 and removing the provision that allows the interior shading option to receive partial credit, rather than modifying Chapter 5 at this meeting. Members also discussed concerns regarding combining energy efficiency measures with renewable energy and load-management measures in a single table. Members determined that retaining a simplified set of alternatives for existing-building alterations provided greater flexibility for varied project conditions and did not amend Table C503.6 on that basis. No vote on the proposed modification to C406.3.4 was taken; the provision was to be brought back for consideration at a subsequent meeting.
- Members completed review of the remaining Chapter 5 provisions, including repairs, change of occupancy or use, and the alternative compliance pathway. Members reviewed the proposal to simplify change-of-occupancy requirements by directing applicable projects to C503 rather than using the new 2024 IECC energy-use-intensity ranking system for mechanical, service water heating, and lighting triggers. Members discussed the additional classification process created by the 2024 IECC and considered it unnecessary where installation of new systems would already trigger the applicable alteration provisions. Members also reviewed the alternative compliance pathway carried forward from the Massachusetts stretch energy code.
- Mike Browne motioned to approve Commercial Chapter 5, seconded by Nathan Darling. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Nathan Darling motioned to approve commercial Chapter 5 code change proposal form, seconded by Mike Browne. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members completed review of the remaining Chapter 5 provisions, including repairs, change of occupancy or use, and the alternative compliance pathway. Members reviewed the proposal to simplify change-of-occupancy requirements by directing applicable projects to C503 rather than using the new 2024 IECC energy-use-intensity ranking system for mechanical, service water heating, and lighting triggers. Members discussed the additional classification process created by the 2024 IECC and considered it unnecessary where installation of new systems would already trigger the applicable alteration provisions. Members also reviewed the alternative compliance pathway carried forward from the Massachusetts stretch energy code.
- The chair briefly opened the floor to a member of the public, Sarah Newman, who wished to address the committee regarding proposed Table C503.6 and, specifically, the inclusion of C406.3.4, Automated Shading. Concerns were raised that automated shading could produce substantially different energy savings depending on existing fenestration performance, orientation, location of shading devices, system operation, and other existing-building conditions. Members reviewed C406.3.4 and discussed the distinction between exterior automated shading and the lower-cost interior shading option that receives partial credit under the 2024 IECC. Members considered removing automated shading entirely from Table C503.6 but concluded that exterior automated shading could provide meaningful energy savings in appropriate existing buildings. Members therefore discussed revisiting C406.3.4 and removing the provision that allows the interior shading option to receive partial credit, rather than modifying Chapter 5 at this meeting. Members also discussed concerns regarding combining energy efficiency measures with renewable energy and load-management measures in a single table. Members determined that retaining a simplified set of alternatives for existing-building alterations provided greater flexibility for varied project conditions and did not amend Table C503.6 on that basis. No vote on the proposed modification to C406.3.4 was taken; the provision was to be brought back for consideration at a subsequent meeting.
- Members then reviewed C503.6 and proposed Table C503.6 governing additional energy efficiency measures for substantial alterations to buildings greater than 20,000 square feet. Members discussed the proposal to simplify the 2024 IECC credit structure by requiring one qualifying measure rather than maintaining multiple point-based tables. Members reviewed the proposed air-leakage option, which would permit a whole-building leakage rate of 0.70 cfm/ft² at 0.3 inches water column (75 Pa), approximately twice the proposed new-construction leakage limit. Members raised concerns regarding multifamily dwelling-unit testing and discussed providing a corresponding testing-unit option. The language was revised to permit testing-unit air leakage of 0.60 cfm/ft² at 0.2 inches water column (50 Pa) based on the testing unit enclosure area and in accordance with the applicable testing provisions.
- Members discussed the application of C403 requirements to alterations, including an exception from C403.7.4, Dedicated Outdoor Air Systems and Energy Recovery Systems. Members raised questions regarding whether an extension of an existing duct system constituted a “new” duct system. Members distinguished between installation of a new heating, cooling, and duct system and extension or reuse of an existing system and determined that no additional amendment was needed to the base language.
- Members reviewed the proposed C503 alterations provisions, including changes to insulation requirements for existing roof, wall, and floor assemblies. Members discussed replacing language concerning roof replacement with an exception for construction where an existing roof, wall, or floor cavity is not exposed. Members also reviewed amendments eliminating provisions considered unclear regarding limiting conditions and reports from registered design professionals. For above-grade wall alterations, members reviewed language requiring newly created cavities to comply with C402.1 and permitting exposed existing cavities to be filled with insulation having a value of not less than R-4 per inch.
- Members reviewed the proposed amendments to Chapter 5, Existing Buildings. Under C501.2, members reviewed amendments removing references to model codes not adopted by Massachusetts and replacing the ASHRAE 90.1 compliance reference with the applicable alternative compliance pathway. Members reviewed changes to C502 governing additions, including clarification of the applicable compliance pathways and modifications to the additional energy efficiency requirements. Members discussed the proposed 20,000-square-foot threshold for additions subject to additional efficiency measures, compared with the substantially lower threshold in the 2024 IECC. Members considered the effect of the change on smaller existing-building projects and noted that the proposed threshold would reduce compliance complexity for those projects. Members also reviewed the renewable energy requirements applicable to additions and discussed how the requirement would be based on the addition and remain subject to the exceptions contained in the referenced renewable energy provisions.
- IECC 2024 C403
- Discussed Matters Not Reasonably Anticipated 48 Hours in Advance of the Meeting
- No matters were discussed.
- Adjournment – The next meeting will be held on September 14th, 2026.
- Nathan Darling motioned to adjourn the meeting, seconded by Paulette McGhee. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Meeting adjourned at 12:04 PM.
Items Relied Upon
Meeting Agenda
Draft Meeting Minutes
2024 IECC
2024 IRC
Code Change Proposals
Applicable portions of 780 CMR
Agenda
| Members |
|---|
| Ian Finlayson |
| Rebecca Ansolabehere |
| Michael Browne |
| Nathan Darling |
| Tarica Leskiw |
| Paulette McGhie |
| Vineet Nair |
| Rebecca Rahmlow |
| Brianna Skowyra |
It is anticipated that the topics shown below will be discussed at the aforementioned meeting:
- Review/Vote Minutes of the following Energy Advisory Meetings:
- July 27, 2026
- August 10, 2026
- Review/Discuss/Vote Code Change Proposal Forms and Front-End Amendments
- IECC 2024 C403
- IECC 2024 Commercial Chapter 5
- IECC 2024 Commercial Chapter 6
- IECC 2024 Commercial Chapter 2
- Review/Discuss/Vote 2024 IRC Appendices
- Appendix ND
- Appendix NE
- Appendix NF
- Appendix NG
- Appendix NH
- Appendix NI
- Appendix NJ
- Appendix NK
- Appendix NL
- Discuss matters not reasonably anticipated by the chair, 48 hours in advance of the meeting