- This page, BBRS Residential Code Subcommittee Meeting- 7.2.26, is offered by
- Division of Occupational Licensure
- Office of Public Safety and Inspections
- Board of Building Regulations and Standards
Public Meeting Notice BBRS Residential Code Subcommittee Meeting- 7.2.26
Overview
This is a remote meeting. You can participate from your computer, laptop, or smartphone. See the Meeting Agenda for details.
You will need
Microsoft Teams meeting link and dial-in number
Meeting ID: 235 709 144 953 851
Passcode: Sd74hQ2e
Dial in to the meeting
Meeting phone number:+1 857-327-9245,,313213372# United States, Boston
Phone conference ID: 313 213 372#
In accordance with the provisions of G.L. c. 30A § 20, notice is hereby given that the Board of Building Regulations and Standards 11th Edition Residential Code Subcommittee will be convening a regular meeting.
If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.
Meeting Minutes
Meeting Minutes – BBRS Residential Code Subcommittee
In accordance with the provisions of G.L. c. 30A § 20, the Board of Building Regulations and Standards Residential Code Committee convened a regular monthly meeting on:
Microsoft Teams Meeting July 2nd, 2026
The topics shown below were discussed at the aforementioned meeting: 9:05 AM In the absence of Chair, Executive Director Tammy Gropman called the open meeting to order.
Informational note: All votes were taken by roll call. Where each member voted in favor, the vote will be reported as unanimous.
Committee Members Present:
- Todd Cantor
- Becca Edson
- Jason Ferschke (dropped at 9:56 AM)
- Len Morse-Fortier
- Ross Seavey
- David Riquinha
Committee Members Absent:
- Greg Gagnon
- Reade Milne
- David Silveira
DOL Staff Present:
- Tammy Gropman, Executive Director
- Charles Kilb, Senior Board Counsel
- Andrew Chase, Associate Executive director
- Reviewed and Voted Meeting Minutes: June 4, 2026
- Ross Seavey motioned to approve meeting minutes, seconded by David Riquinha. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Review/Discuss/Vote Front End Amendments
- R309.2/Appendix BO Front End Amendments for Code Change Proposal
- Members reviewed the front-end amendment concerning automatic sprinkler requirements for two-family dwellings. Members discussed whether the reference to “aggregate area” should be revised to “aggregate gross floor area” to avoid confusion with other measurements of conditioned and gross floor area used throughout the code. Members discussed whether newly constructed two-family dwellings should be required to have automatic sprinkler systems. Concerns were raised that extending the requirement to two-family dwellings would increase construction costs and further affect housing affordability. Members questioned whether residential sprinkler systems primarily protect property rather than occupants and emphasized the importance of early fire detection and notification. Other members stated that residential sprinkler systems have demonstrated life-safety benefits, limit property damage, reduce displacement following fires, and provide additional time for occupants to escape. Members also discussed the existing 14,400-square-foot threshold. Some members questioned the basis for retaining that threshold while requiring sprinklers in substantially smaller two-family dwellings. It was noted that the 14,400-square-foot provision had appeared in prior code editions and reportedly originated when building materials were considered more susceptible to fire. Members were advised that approval of the front-end amendment was necessary to complete the proposal package for consideration by the BBRS and that the proposal required the applicable 70-percent subcommittee approval threshold.
- David Riquinha motioned to reject the front-end amendment language, seconded by Ross Seavey. A roll call vote was held, two members voting in favor of rejection (David Riquinha, Ross Seavey), , three opposed (Todd Cantor, Becca Edson, Jason Ferschke) and one abstaining (Len Morse Fortier). The motion failed.
- Members discussed whether to vote on approval, continue the matter, or forward it to the BBRS without subcommittee consensus. David Riquinha motioned to table item until the following meeting, seconded by Jason Ferschke. A roll call vote was held, with five members voting in favor and one opposed (Ross Seavey).
- Review/Discuss/Vote IRC and 780 CMR 51.00 Chapter Reviews
- 2024 IRC Appendix BC – Accessory Dwelling Units
- Members reviewed Appendix BC and discussed how its accessory dwelling unit provisions would interact with Massachusetts requirements. Members considered whether adding an accessory dwelling unit to an existing two-family dwelling could result in a three-unit building that would be regulated outside the residential code. It was noted that Massachusetts currently regulates accessory dwelling units as dwelling units without adopting a separate IRC accessory dwelling unit framework and that related requirements may also be addressed through the energy code and Massachusetts general law. Members raised concerns that wholesale adoption of Appendix BC could conflict with or duplicate the Commonwealth’s existing treatment of accessory dwelling units. Members stated that the subject could be revisited through Massachusetts-specific provisions rather than adoption of the complete IRC appendix.
- Ross Seavey motioned to not to adopt Appendix BC, seconded by David Riquinha. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- 2024 IRC Appendix BL – Hemp-Lime Construction
- Members reviewed Appendix BL, which contains requirements for nonstructural hemp-lime construction. Members noted that the appendix is new to the 2024 IRC, applies to a building material rather than a structural system, and is within the scope of the Residential Code Subcommittee. Although members indicated that hemp-lime construction is not commonly encountered in Massachusetts, they stated that the appendix provides an established regulatory framework should the material be proposed.
- Ross Seavey motioned to adopt Appendix BL without amendment, seconded by Becca Edson. A roll call vote was held, David Riquinha abstained, none opposed. Motion passed with majority.
- 2024 IRC Appendix BN – Extended Plate Wall Construction
- Members reviewed Appendix BN, which is new to the 2024 IRC. Members discussed extended plate wall construction as a method in which the bottom plate extends toward the exterior beyond the wall studs, providing support for exterior rigid insulation and facilitating improved air sealing. Members noted that the appendix establishes requirements for this construction method.
- Todd Cantor motioned to adopt Appendix BN, seconded by Becca Edson. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members reviewed Appendix BN, which is new to the 2024 IRC. Members discussed extended plate wall construction as a method in which the bottom plate extends toward the exterior beyond the wall studs, providing support for exterior rigid insulation and facilitating improved air sealing. Members noted that the appendix establishes requirements for this construction method.
- 2024 IRC Appendix CG – Non-Sewered Sanitation Systems
- Members reviewed Appendix CG and stated that non-sewered sanitation systems are addressed through the Massachusetts plumbing code and require approval under the authority of the Board of State Examiners of Plumbers and Gas Fitters. Members determined that adoption in 780 CMR 51.00 would be duplicative or outside the appropriate regulatory jurisdiction.
- Ross Seavey motioned to not adopt Appendix CG, seconded by David Riquinha. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members reviewed Appendix CG and stated that non-sewered sanitation systems are addressed through the Massachusetts plumbing code and require approval under the authority of the Board of State Examiners of Plumbers and Gas Fitters. Members determined that adoption in 780 CMR 51.00 would be duplicative or outside the appropriate regulatory jurisdiction.
- 2024 IRC Appendices ND, NE, NF, NG, NH, NI, NJ, NK, and NL
- Members reviewed the group of new energy-related appendices, including provisions addressing energy storage and other energy systems. Members questioned whether some of the requirements were already addressed elsewhere in the Massachusetts codes. It was noted that the Energy Advisory Subcommittee has the technical expertise to determine whether each appendix is already covered, should be adopted, or requires Massachusetts-specific amendments.
- Todd Cantor motioned to take no action to review Appendices ND, NE, NF, NG, NH, NI, NJ, NK, and NL as they fall under the Energy Advisory Committee, seconded by David Riquinha. A roll call vote was held, none abstained, none opposed. Motion passed unanimously.
- 2024 IRC Chapter 13 – General Mechanical System Requirements
- Members reviewed Chapter 13 and the existing Massachusetts amendment Members discussed whether the amendment should be carried forward because related requirements may already be contained in the plumbing, fuel gas, mechanical, or boiler regulations. Members clarified that the chapter includes solid-fuel-burning appliances, which are not necessarily regulated through the fuel gas provisions. Members reviewed the reference to M.G.L. c. 146 and noted that the cited statutory provisions address the numbering, stamping, tagging, and defacement of boiler identification. Members also discussed the importance of permanent labels on used solid-fuel-burning appliances, including wood stoves, so that an inspector can determine whether an appliance is listed and complies with applicable requirements.
- Ross Seavey motioned to adopt Chapter 13 without amendment, seconded by David Riquinha. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members reviewed Chapter 13 and the existing Massachusetts amendment Members discussed whether the amendment should be carried forward because related requirements may already be contained in the plumbing, fuel gas, mechanical, or boiler regulations. Members clarified that the chapter includes solid-fuel-burning appliances, which are not necessarily regulated through the fuel gas provisions. Members reviewed the reference to M.G.L. c. 146 and noted that the cited statutory provisions address the numbering, stamping, tagging, and defacement of boiler identification. Members also discussed the importance of permanent labels on used solid-fuel-burning appliances, including wood stoves, so that an inspector can determine whether an appliance is listed and complies with applicable requirements.
- 2024 IRC Chapter 14 – Heating and Cooling Equipment and Appliances
- Members reviewed Chapter 14 and the existing Massachusetts amendments concerning used solid-fuel-burning appliances, including Section M1401.6 and related provisions. Members discussed whether the code identifies a specific date for appliances that predate listing requirements and noted that no clear date was located during the review. Members raised concerns regarding language in Section M1401.6 stating that an installation may be inspected by the building official “or fire official in such towns that utilize the fire official for such inspection purposes.” Members stated that 780 CMR cannot grant inspectional authority to a fire official unless that authority independently exists under 527 CMR. It was noted that, where applicable, a reference to an existing fire-code requirement could be included for the user’s benefit, but the building code should not assign authority that is not otherwise established.
- David Riquinha motioned to carry forward the Chapter 14 amendments while striking the language authorizing inspection by a fire official, seconded by Todd Cantor. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members reviewed Chapter 14 and the existing Massachusetts amendments concerning used solid-fuel-burning appliances, including Section M1401.6 and related provisions. Members discussed whether the code identifies a specific date for appliances that predate listing requirements and noted that no clear date was located during the review. Members raised concerns regarding language in Section M1401.6 stating that an installation may be inspected by the building official “or fire official in such towns that utilize the fire official for such inspection purposes.” Members stated that 780 CMR cannot grant inspectional authority to a fire official unless that authority independently exists under 527 CMR. It was noted that, where applicable, a reference to an existing fire-code requirement could be included for the user’s benefit, but the building code should not assign authority that is not otherwise established.
- 2024 IRC Chapter 16 – Duct Systems
- Members reviewed Chapter 16 and the existing Massachusetts amendments directing users to comply with the additional duct-system requirements of Chapter 11 of 780 CMR 51.00. Members considered replacing several separate amendments with one general provision stating that duct systems must comply with both Chapter 16 and Chapter 11 and that Chapter 11 would control where a conflict exists. Members discussed whether language regarding conflicts could be included as a user note or whether it would need to appear as enforceable code text. It was noted that a user note could direct readers to Chapter 11, but language resolving a conflict between requirements should be included in a mandatory provision. Members considered revising Section M1601.1 by incorporating language similar to the existing amendment at M1601.4.6. Concerns were raised that placing a general provision in M1601.1 could be overly broad because the individual sections of Chapter 16 separately address duct design, installation, and insulation. Members also questioned whether actual conflicts exist between Chapters 11 and 16 or whether the existing amendments have simply been carried forward through successive editions. Members agreed that the chapters should be compared before deciding whether amendments are necessary and, if so, where they should be placed.
- Ross Seavey motioned to table Chapter 16 until the next meeting, seconded by David Riquinha. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Members reviewed Chapter 16 and the existing Massachusetts amendments directing users to comply with the additional duct-system requirements of Chapter 11 of 780 CMR 51.00. Members considered replacing several separate amendments with one general provision stating that duct systems must comply with both Chapter 16 and Chapter 11 and that Chapter 11 would control where a conflict exists. Members discussed whether language regarding conflicts could be included as a user note or whether it would need to appear as enforceable code text. It was noted that a user note could direct readers to Chapter 11, but language resolving a conflict between requirements should be included in a mandatory provision. Members considered revising Section M1601.1 by incorporating language similar to the existing amendment at M1601.4.6. Concerns were raised that placing a general provision in M1601.1 could be overly broad because the individual sections of Chapter 16 separately address duct design, installation, and insulation. Members also questioned whether actual conflicts exist between Chapters 11 and 16 or whether the existing amendments have simply been carried forward through successive editions. Members agreed that the chapters should be compared before deciding whether amendments are necessary and, if so, where they should be placed.
- Discuss Matters Not Reasonably Anticipated 48 Hours in Advance of the Meeting
- Members briefly raised the subject of pyrrhotite in concrete aggregate and whether the issue should be considered in a future code review. As the matter was not listed on the agenda, members did not enter into a substantive discussion. Board Counsel stated that any future consideration should be tied to a specific IRC chapter or provision within the subcommittee’s jurisdiction. It was also suggested that the subject may be more appropriately considered by the geotechnical subcommittee.
- Adjournment – The next meeting is scheduled for July 16th, 2026
- Becca Edson motioned to adjourn, seconded by Todd Cantor. A roll call vote was held, none opposed, none abstained. Motion passed unanimously.
- Meeting adjourned at 11:15 AM.
Items Relied Upon
- Meeting Agenda
- Meeting Minutes
- Code Change Proposal
- 2024 IRC
- 780 CMR provisions
Agenda
| Members |
|---|
| David Riquinha |
| Todd Cantor |
| Becca Edson |
| Jason Ferschke |
| Greg Gagnon |
| Reade Milne |
| Len Morse-Fortier |
| Ross Seavey |
| David Silveira |
It is anticipated that the topics shown below will be discussed at the aforementioned meeting:
- Review/Discuss/Vote Minutes of the following meetings:
- Residential Code Subcommittee June 4, 2026
- Review/Discuss/Vote Front End Amendments
- R309.2/ Appendix BO Front End Amendments for Code Change Proposal submitted by T. Cantor
- Review/Discuss/ Vote IRC and 780 CMR 51.00 Chapter Reviews
- 2024 IRC Appendix BC
- 2024 IRC Appendix BL
- 2024 IRC Appendix BN
- 2024 IRC Appendix CG
- 2024 IRC Appendix ND
- 2024 IRC Appendix NE
- 2024 IRC Appendix NF
- 2024 IRC Appendix NG
- 2024 IRC Appendix NH
- 2024 IRC Appendix NI
- 2024 IRC Appendix NJ
- 2024 IRC Appendix NK
- 2024 IRC Appendix NL
- 2024 IRC Chapter 13
- 2024 IRC Chapter 14
- 2024 IRC Chapter 16
- Discuss matters not reasonably anticipated by the chair, 48 hours in advance of the meeting