Public Meeting Notice

Public Meeting Notice  Natick - Bridge Replacement & Interchange Improvements at Routes 27/9

Thursday, November 21, 2024 at 6:30 p.m.

Overview   of Natick - Bridge Replacement & Interchange Improvements at Routes 27/9

A live Virtual Public Information Meeting will be hosted on the MassDOT website below to present an update on the proposed bridge replacement project and interchange improvements in Natick, MA.

Purpose:

The purpose of this meeting is to update the public on the status of the bridge replacement project and interchange improvements. MassDOT will present on the project background, the project design, the schedule and construction phasing, public involvement, and next steps. All views and comments will be reviewed and considered to the maximum extent possible.

Proposal:

This project will include the replacement of the structurally deficient Bridge No. N-03-020 which carries North Main Street (Route 27) over Worcester Street (Route 9) and consists of the reconfiguration of the interchange to a modified Diverging Diamond Interchange (DDI) configuration. The reconfiguration will provide safety improvements, reduced traffic congestion through the interchange, and improved bicycle and pedestrian facilities using separated shared use paths and sidewalks. The project length is approximately 3,850 feet along Route 9 and 2,120 feet along Route 27. The work will also include transit stops along Route 27 and Route 9 along with reconstructed sidewalks, drainage improvements, traffic signals, retaining walls, utility relocations, signing, roadway lighting, and landscaping.

This meeting is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (e.g., interpreters in American Sign Language and languages other than English, live captioning, videos, assistive listening devices and alternate material formats), as available.  For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580),  TTD/TTY at (857) 266-0603, fax (857) 368-0602 or by email (MassDOT.CivilRights@dot.state.ma.us). Requests should be made as soon as possible prior to the meeting, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, requests should be made at least ten business days before the meeting.

This meeting will be hosted, or a cancellation announcement posted, on this website. 

Additional Resources   for Natick - Bridge Replacement & Interchange Improvements at Routes 27/9

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback