Public Hearing Notice

Public Hearing Notice  Newton/Weston: proposed bridge replacement and rehabilitation at I-90/I-95 Interchange

Thursday, March 31, 2022 at 6:00 p.m.

Overview   of Newton/Weston: proposed bridge replacement and rehabilitation at I-90/I-95 Interchange

A Live Virtual Public Information Meeting will be hosted on the MassDOT website below to present the design for the proposed Newton-Weston Bridge Replacement and Rehabilitation at I-90/I-95 Interchange project in Newton and Weston, MA.

Purpose:

The purpose of this meeting is to provide the public with the opportunity to become fully acquainted with the proposed Newton-Weston Bridge Replacement and Rehabilitation at I-90/I-95 Interchange project. All views and comments submitted in response to the meeting will be reviewed and considered to the maximum extent possible.

Proposal:

The proposed project consists of replacing and rehabilitating a series of eight bridges at the Interstate 90/Interstate 95 interchange (I-90/I-95). The bridges include I-90’s crossing of I-95 and the Charles River, I-90 Over the Worcester Mainline commuter rail tracks just east of the Charles River, as well as ramp bridges within the I-90/I-95 interchange itself. Of the eight bridges, five will be replaced, one will be rehabilitated, and two will have their superstructure replaced. The proposed project will provide bridge and roadway safety improvements, increase vertical clearance for freight movements, improve seismic resiliency and reduce noise impacts through the installation of noise walls along I-90 in Auburndale to the project's eastern limit of work. MassDOT will use staged construction to maintain existing three lanes of I-90 during construction. The project will also use accelerated bridge replacement and offline construction.

A secure right-of-way is necessary for this project. Acquisitions in fee and permanent or temporary easements may be required. The Commonwealth of Massachusetts is responsible for acquiring all needed rights in private or public lands. MassDOT's policy concerning land acquisitions will be presented in the meeting.

 

Project inquiries may be emailed to dot.feedback.highway@state.ma.us.

This meeting is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (e.g. interpreters in American Sign Language and languages other than English, live captioning, videos, assistive listening devices and alternate material formats), as available. For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580), TTD/TTY at (857) 266-0603, fax (857) 368-0602 or by email (MASSDOT.CivilRights@dot.state.ma.us). Requests should be made as soon as possible and prior to the hearing, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, requests should be made at least ten business days before the meeting.

Hearing webinar or cancellation announcements will be posted on this website.

Additional Resources   for Newton/Weston: proposed bridge replacement and rehabilitation at I-90/I-95 Interchange

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback