Important Requirement
Prior to accessing DCAMM c.25A RFP documents which include plans and specifications for state facilities, companies must be verified by the DCAMM Energy & Sustainability Group. Companies planning to access DCAMM c.25A RFP documents on DCAMM’s c.25A E-Bid Room site should immediately apply for DCAMM c.25A E-Bid Room Verification by completing the form below
Verification Criteria
To be granted access to plans on the DCAMM 25A E-Bid Room site, a company must meet the following criteria:
1) Be registered and in good standing with the Massachusetts Secretary of State
AND
2) be actively involved in providing any of the following related services in Massachusetts either as a prime contractor or subcontractor:
- Energy (including water) management, climate change adaptation, or resilience Consulting
- Energy (including water) management, climate change adaptation, or resilience Design/Engineering
- Energy (including water) management, climate change adaptation, or resilience Construction