All aboveground storage tanks (ASTs) greater than 10,000 gallons that store any fluid other than water require permits and inspections.

DFS Code Compliance

The Details of Apply for aboveground storage tank permits

What you need for Apply for aboveground storage tank permits

You need a permit from the Office of the State Fire Marshal to construct or install new (or used) aboveground storage tanks (ASTs). Upon completion, and a successful inspection, you will receive a use permit for the tank. Permits must be renewed every five years.

Tank owners must inspect and maintain tanks in accordance with approved standards.

You must apply for a maintenance permit for certain types of work on existing tanks.

 

Fees for Apply for aboveground storage tank permits

Name Fee Unit
Permit for Installation or Construction of Aboveground Storage Tank $100 For each tank for the 1st 100,000 gals plus $1 for each additional 1,000 gals
Permit for Maintenance of Tanks $100 Each
Renew an AST Use Permit $15 Each

How to apply Apply for aboveground storage tank permits

Submit completed applications, required attachments (3 sets), and fee to:

Department of Fire Services
P.O. Box 1025
Stow, MA 01775
Attn: AST Program

Next steps for Apply for aboveground storage tank permits

  1. New aboveground storage tank permits

    All new construction and new installations of ASTs (including relocated tanks and installation of used tanks) require the permit.

    Applications must include:

    • Completed application for installation or construction
    • Plot plan reviewed by a MA professional engineer
    • Foundation plan reviewed by a MA professional engineer
    • Dike plan reviewed by a MA professional engineer
    • Mechanical tank drawings reviewed by a MA professional engineer
    • Fire safety analysis (for flammable gases only or where required by the State Fire Marshal) reviewed by a MA professional engineer;
    • Used tanks require a detailed inspection investigation and suitability assessment report reviewed by a MA professional engineer
    • Copy of manufacturer's Data Report for Pressure Vessels (if applicable)
    • Copy of the land license (MGL C 148 s.13) if applicable
    • Copy of the current registration for the property (MGL C 148 s.13) if applicable
    • Identification and declaration of approved standard that will be used for the inspection and maintenance of the tank
    • The State Fire Marshal may require additional information
    • Fee

    Three sets of the application and attachments must be submitted.

    Incomplete applications are returned to you without review.

    Applications are reviewed by the Office of the State Fire Marshal prior to issuing the permit. Reviews take up to 30 days.

    If your application is approved, you will receive a permit to construct the tank with specific requirements.

    Installation must start within 6 months and be completed within one year.

  2. Obtaining a use permit

    After the tank is constructed or installed and tested, you must provide documentation to the Office of the State Fire Marshal.

    We conduct an inspection. If the tank passes the inspection you will be issued a use permit that is good for 5 years.

    If the local fire department also signs off on applicable permits, you can begin to use your tank.

  3. Regular tank inspections

    Tank owners are required to inspect and maintain tanks in accordance with the approved standard.

  4. Renewing AST use permits

    Renew AST use permits every 5 years. 

    Submit an application to renew the AST use permit and fee:

    • $30 for one tank
    • $25 for two tanks
    • $15 for three tanks of a gross capacity of < 1 million gallons
    • $25 for three tanks of a gross capacity of > 1 million gallons

    The application form is currently under development.

  5. Apply for an AST maintenance permit

    For certain types of work on existing tanks, you must apply for a maintenance permit. The types of work include: the installation, removal, replacement or penetration of any shell plate, annular plate ring material, tank bottom, roof or weld joint which involves the repair, replacement or installation of any materials with a dimension greater than 12 inches or the jacking or movement of any existing tank.

    Maintenance does not include routine painting, cleaning, or removal of superficial oxidation incidental to the painting, or cleaning or dismantling of a tank done with a valid permit issued by the head of the fire department.

    Cutting a hole in a tank to limit the amount of available storage is not considered maintenance.

    The application form is currently under development.

     

Contact for Apply for aboveground storage tank permits

Address
DFS Code Compliance
1 State Road, Stow, MA 01775

Feedback

Did you find what you were looking for on this webpage? * required
We use your feedback to help us improve this site but we are not able to respond directly. Please do not include personal or contact information. If you need a response, please locate the contact information elsewhere on this page or in the footer.
We use your feedback to help us improve this site but we are not able to respond directly. Please do not include personal or contact information. If you need a response, please locate the contact information elsewhere on this page or in the footer.

If you need to report child abuse, any other kind of abuse, or need urgent assistance, please click here.

Tell us what you think