Log in links for this page
- This page, WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges, is offered by
- Massachusetts Department of Environmental Protection
WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
Contact for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
Septic Systems / Title 5 Contact Information
The Details of WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
What you need for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
This approval is necessary to allow for a determination of an alternative Title 5 design flow (BRP WP 70) or for the discharge of small quantities of non-sanitary wastewater to Title 5 systems (BRP WP 70a).
You must apply for this approval if you are proposing to:
- use an alternative Title 5 design flow (310 CMR 15.203(6))
- discharge non-sanitary wastewater to a Title 5 system.
How to file WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
File online via the EEA ePlace Portal. See details below.
Next steps for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
-
Review the Instructions
Guidance on how to prepare your certification and file it online, as follows:
Open PDF file, 141.56 KB, BRP WP 70: Alternative Design Flow for Title 5 System: Instructions (English, PDF 141.56 KB)Open DOCX file, 181.08 KB, Instructions: BRP WP 70: Alternative Design Flow for Title 5 System (English, DOCX 181.08 KB)Open PDF file, 2.36 MB, WP70,70a ePLACE step-by-step instructions (English, PDF 2.36 MB)Complete the Application Form
Please fill out and save the Microsoft Word or Acrobat Adobe PDF form on your computer.
Important Note: Even when applying online, you will still need to complete a conventional Application Form and upload it as an attachment during the online filing process. Please do not mail in these forms.
Open PDF file, 127.49 KB, BRP WP 70: Alternative Design Flow for Title 5 System (English, PDF 127.49 KB)Open DOCX file, 88.39 KB, BRP WP 70: Alternative Design Flow for Title 5 System (English, DOCX 88.39 KB)Submit your Application and Fee Payment
- File online via the EEA ePlace Portal.
- You will have the option to pay online by credit card or automated clearing house (ACH) or pay by mail. If you select the pay-by-mail option, instructions on how to do so will be provided when you submit your online application.
Open PDF file, 479.6 KB, How to Create Your EEA ePLACE Account (English, PDF 479.6 KB)Open PDF file, 2.27 MB, ePLACE Comprehensive User Manual (English, PDF 2.27 MB)Contact for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges
Phone
ePLACE Help Desk Call EEA ePLACE Help Desk, ePLACE Help Desk at 844-733-7522Open M-F 7:30 am-5:00 pm, with the exception of all Commonwealth & Federally observed holidays.
Related