WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

Approval of alternative design flow under Title 5, or for discharge of small quantities of non-sanitary wastewater to Title 5 systems.

Septic Systems / Title 5 Contact Information

EEA ePLACE Help Desk

Phone

Open M-F 7:30 am-5:00 pm, with the exception of all Commonwealth & Federally observed holidays.

The Details   of WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

What you need   for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

This approval is necessary to allow for a determination of an alternative Title 5 design flow (BRP WP 70) or for the discharge of small quantities of non-sanitary wastewater to Title 5 systems (BRP WP 70a).

You must apply for this approval if you are proposing to:

  1. use an alternative Title 5 design flow (310 CMR 15.203(6))
  2. discharge non-sanitary wastewater to a Title 5 system.

Fees   for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

How to file   WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

File online via the EEA ePlace Portal. See details below.

Next steps   for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

  1. Review the Instructions

  2. Complete the Application Form

    Please fill out and save the Microsoft Word or Acrobat Adobe PDF form on your computer.

    Important Note: Even when applying online, you will still need to complete a conventional Application Form and upload it as an attachment during the online filing process. Please do not mail in these forms.

  3. Submit your Application and Fee Payment

    1. File online via the EEA ePlace Portal.
    2. You will have the option to pay online by credit card or automated clearing house (ACH) or pay by mail. If you select the pay-by-mail option, instructions on how to do so will be provided when you submit your online application.

Contact   for WP 70, 70a: Alternative Design Flow for Title 5 Systems & Non-Sanitary Wastewater Discharges

Phone

Open M-F 7:30 am-5:00 pm, with the exception of all Commonwealth & Federally observed holidays.

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback