Overview
|
Contract Number |
Description |
Original Award Amount |
|
E22CN04 |
Green Line Extension (GLX), Fitchburg Mainline Track and Miller's River Drainage Improvements |
$116,635,126 |
|
E22CN06 |
GLX, Procurement of Viaduct Steel, Fabrication and Pricing of Installation |
39,600,110 |
|
E22CN02 |
GLX, Long Lead Items, Cambridge, Medford, and Somerville |
32,235,006 |
|
P42CN01 |
Orange Line Substations, Traction Power Station Service and Building Upgrades, Boston, Medford, and Malden |
30,109,912 |
|
B64CN02 |
Rehabilitation of Merrimack River Bridge Piers, Haverhill |
28,270,000 |
|
T40CN01 |
Red Line Signal Trough and Winter Resiliency Improvement Project, Boston |
18,510,000 |
|
K78CN01 |
South Coast Rail Early Work, Grade Crossings Improvement Project, Taunton, New Bedford, and Freetown |
18,367,000 |
|
E22CN03 |
GLX Early Utility Work, Phases 2/2A and 4, Cambridge/Somerville/Medford |
18,042,718 |
|
R32CN01 |
Wellington Yard Expansion—Tracks 33–38, Medford |
17,977,777 |
|
H62CN02 |
Repair/Rehabilitation of Beverly Drawbridge, Contract #2 Swing Span, Beverly/Salem |
16,177,594 |
|
A90CN06 |
Downtown Crossing, Vertical Transportation and Station Improvements, Boston |
13,570,000 |
|
B73CN01 |
Reconstruction of Shore Line Bridge, Boston |
12,450,000 |
|
S19CN03 |
On-Call Construction Services—Track/Row, Systemwide |
10,967,000 |
|
R18CN01 |
Everett Bus Maintenance Facility—Cellular Concrete Fill Project, Everett |
9,997,350 |
|
S19CN01 |
On-Call Construction Services—General Transit, Systemwide |
8,680,140 |
|
A90CN01 |
Andrew and Tufts Medical Center Station Elevator Modernization, Boston |
7,767,000 |
|
H62CN01 |
Repair/Rehabilitation of Beverly Drawbridge over Danvers River, Approach Span, Beverly |
7,282,033 |
|
C72CN03 |
Worcester Line Improvement Rail Installation, Framingham to Worcester |
6,467,600 |
|
P63CN01 |
Systemwide Transformer Replacement, Phase II |
5,844,317 |
|
R40CN01 |
Cabot Carhouse—Phase 1 Improvements, Re-advertisement, Boston |
4,933,595 |
|
H73CN01 |
Reconstruction of LaGrange Street Bridge, Boston |
4,480,000 |
|
T92CN01 |
Knowledge Corridor Underpass, Northampton |
4,434,700 |
|
B91CN12 |
Emergency Bridge Repair 2, Systemwide |
4,155,600 |
|
A90CN08 |
Park Street Vertical Transportation Improvement—Replacement Project, Boston |
4,000,000 |
|
H74CN10 |
Reconstruction of Guild Street Bridge, Norwood |
3,951,500 |
|
U90CN01 |
Underground Storage Tank Replacement Program, Systemwide |
3,489,415 |
|
R20CN01 |
Work Platform for Riverside Carhouse, Newton |
2,574,100 |
|
P90CN01 |
Bridgewater Wind Turbine, Bridgewater |
2,282,885 |
|
Y44CN02 |
Rehabilitation of Red Line Tunnel Spall Repairs, Boston, Cambridge, and Somerville |
2,061,250 |
|
C72CN02 |
Worcester Commuter Rail De-stressing Project, Framingham |
1,990,800 |
|
B01CN01 |
Rehabilitation of Savin Hill Overpass, Boston |
1,568,248 |
|
W46CN03 |
South Shore Garages, Urgent Repairs, Quincy and Braintree |
1,465,012 |
|
C72CN01 |
Worcester Commuter Rail Line, Track and Signal System Improvements, Boston to Worcester |
1,113,100 |
|
D74CN01 |
Data Center Upgrade Project, Boston |
867,860 |
|
S90CN01 |
Braintree and Lechmere Canopy Repairs, Braintree and Cambridge |
641,390 |
|
R54CN01 |
Stabilization Repairs—Initial Phase, Alford Street Bus Facility—Sea Wall and Drainage Structures, Boston |
335,332 |
|
T32CN01 |
Emergency Resiliency Repairs at Malden Culvert |
218,347 |
|
S03CN08 |
Pemberton Point Ferry Dock Emergency Repair, Hull |
61,835 |
|
R28CN01 |
Watertown Exhaust Stack Demolition, Watertown |
30,601 |
|
Total |
$463,606,253 |