Esplanade Riverfront Pavilion Planning Project

A plan to make the Lee Pool a multi-purpose pavilion
Lee Poll c.1952
Lee Poll c.1952

DCR has hired a project team led by Maryann Thompson Architects, who will examine the existing buildings and site, develop conceptual design alternatives, and develop a final schematic design.

Site description

The project site is located in Charlesbank, the easternmost section of the Charles River Esplanade. Charlesbank runs from the Charles River Dam to the Longfellow Bridge and was originally designed by Frederick Law Olmsted in the 1890s. Much of the land is filled wetlands. The parkland was widened and redesigned over time to accommodate changes to the dams and roadways, with the last design (1949) by Arthur Shurcliff remaining somewhat intact today. Both Olmsted and Shurcliff’s designs focused on providing access to the water and accommodating active outdoor recreation.

The project area consists of the Lee Pool complex – the bathhouse, bleachers and the diving and swimming pools – and associated parkland. The area is flanked to the west by the Teddy Ebersol Red Sox Fields, to the south by Storrow Drive, and to the north by the Charles River. Completed in 1951, Lee Pool has been closed since the 1990s and is now used for maintenance and storage. A 2012 assessment recommended major upgrades if the bathhouse were to be rehabilitated for a new use.

Project goals

The project team will lead a public planning process and develop a design concept for a new riverfront pavilion and park in the area of the Lee Pool. The new building will be a signature, LEED certified building, the first new construction on the Esplanade in over 50 years. Specific project goals are to:

  • Engage the community, DCR partners, and user groups in planning and programming;
  • Create an indoor, year round event venue including food service, areas for DCR programs, and partnership events;
  • Provide critical park amenities such as bathrooms and water fountains;
  • Support DCR’s Esplanade maintenance and storage use;
  • Increase access to the waterfront;
  • Broaden opportunities for active outdoor recreation;
  • Reclaim parkland;
  • Connect the Lee Pool area to the broader Esplanade landscape.
Lee Pool today
Lee Pool today

Scope of work

This project will result in a publicly vetted, schematic design and preliminary cost estimates for the new pavilion, landscape rehabilitation and associated structures. Products include existing conditions assessments, engineering reports, a public participation plan, conceptual designs and a Building Study Report. Project tasks and products are listed below

Task 1 – Develop a Public Process Program
This task includes a public outreach strategy, creation of a Stakeholders Group, public meetings and printed materials.

Task 2 - Existing Conditions Analysis
Under this task the planning team will survey the property, assess the buildings and site, update existing conditions reports, analyze circulation and parking, and analyze regulatory requirements.

Task 3 - Develop Program for Lee Pool Area
The planning team will lead a public design charrette and visioning session to evaluate current use and function, assess needs, discuss goals and develop a program for the site, including the Lee Pool Bath House, pool area, and surrounding landscape.

Task 4 - Conceptual Design Alternatives
Once DCR, the Stakeholders Group and the consultants have defined the program for the site, the planning team will create conceptual designs for a new pavilion, including cost estimates. Alternatives will be presented to the public for community feedback.

Task 5 - Selection of Preferred Concept and Design Development
The consultant, in conjunction with DCR and the Stakeholders Group, will evaluate the public response to the concepts presented. Upon selection of the preferred alternative, the consultant shall proceed with schematic design development. The preferred design will be presented to the public.

Task 6 - Building Study Report
Under this task the consultant shall prepare a draft and final study report . The report will integrate the products of all tasks above, including a summary of the public process as an appendix, and will include a final Estimated Construction Cost.

Status and next steps

Public meeting scheduled for November 1, 2017

 

Meetings

November 1, 2017:Esplanade Riverfront Pavilion Planning Project
Notice   Presentation   Public Comments

June 28, 2017: Esplanade Riverfront Pavilion Planning
Notice   Presentation    Public Comments

April 13, 2017: Public Meeting & Design Charrette
Notice  Presentation  Public Comments

Additional Resources for Meetings

Feedback

Did you find what you were looking for on this webpage? * required
We use your feedback to help us improve this site but we are not able to respond directly. Please do not include personal or contact information. If you need a response, please locate the contact information elsewhere on this page or in the footer.
We use your feedback to help us improve this site but we are not able to respond directly. Please do not include personal or contact information. If you need a response, please locate the contact information elsewhere on this page or in the footer.

If you need to report child abuse, any other kind of abuse, or need urgent assistance, please click here.

Feedback