South Coast Rail Project corridor maps

Interactive and printable corridor maps for the South Coast Rail Project showing the project’s phasing plan.

South Coast Rail Interactive Corridor Map
The interactive corridor map provides a detailed, street-by-street view of the entire Phase 1 and Full Build corridors, including each station and layover facility. You can enter a property’s street address to locate where a property is in relation to the tracks.

Phase 1 Corridor Map

Phase 1 will use the existing Middleborough/Lakeville Commuter Rail Line to provide service from Boston’s South Station to Taunton, New Bedford and Fall River. Phase 1 follows the Middleborough Secondary west to Cotley Junction. The route then continues south and splits into two legs at Myricks Junction: one leg bound for Fall River following the Fall River Secondary and one leg bound for New Bedford following the New Bedford Main Line.

A high-resolution map is linked below under Additional Resources.

Additional Resources for

Full Build Corridor Map

The Stoughton Electric (Full Build), the preferred alternative, starts at Stoughton station and follows the new Stoughton Line to Cotley Junction. The route then continues south and splits into two legs at Myricks Junction: one leg bound for Fall River following the Fall River Secondary and one leg bound for New Bedford following the New Bedford Main Line.

A high-resolution map is linked below under Additional Resources.

Additional Resources for