| Date: | 05/18/2026 |
|---|
What: Effective immediately and continuing through the end of the summer, the Massachusetts Department of Transportation will be conducting stormwater infrastructure work in the area of Gate 36 of Wachusett Reservoir on Route 110 in the Town of Sterling. The gate will remain open during this time, and parking will be limited along Route 110. Visitors are urged to travel cautiously in this area while work is occurring.
Where: Gate 36 of Wachusett Reservoir in the Town of Sterling
When: Effective immediately – end of summer
###