Public Meeting Notice

Public Meeting Notice  Board of State Examiners of Plumbers and Gas Fitters Code Subcommittee Meeting - 6.17.26

Meeting start time: 1:00pm
Posted: June 9, 2026 3:21 p.m.

Overview

This is a remote meeting. You can participate from your computer, laptop, or smartphone. See Meeting Agenda for details.

You will need

Join: Join the Microsoft Teams Meeting 

Meeting ID: 286 917 850 253 233 

Passcode: zG9wQ6ur 

Dial in by phone 

+1 857-327-9245,,123154358# United States, Boston 

Phone conference ID: 123 154 358#

In accordance with the provisions of G.L. c. 30A § 20, notice is hereby given that the Board of State Examiners of Plumbers and Gas Fitters Plumbing Board Subcommittee will be convening their monthly meeting.

Meeting Minutes

In accordance with the provisions of G.L. c. 30A § 20, the Board of State Examiners of Plumbers and Gas Fitters convened a meeting of its Plumbing Code Subcommittee meeting: 

Microsoft Teams Meeting Wednesday June 17, 2026, at 1:01 pm.

The topics shown below were discussed at the aforementioned meeting.  At 1 pm, the Chair, Joseph McNamee called the open meeting to order. 

Informational note: All votes were taken by roll call. Where each member voted in favor, the vote will be reported as unanimous.

Board members present: 

  • Mr. Joseph McNamee, Chairman, Master Gas Fitter
  • Mr. John Cruz, Member, LP Installer
  • Mr. Bahig A. Kaldas, P.E., Member, plumbing Engineer
  • Mr. Wayne Thomas, Member, Journeyman Gas Fitter
  • Ms. Ruth Alfasso, Member, Department of Public Health
  • Ms. Sarah Badway, Public Member
  • Mr. Dan Kilburn, Member, DOL Designee
  • Ms. Kimberly Garside, Member, Master Plumber

Board members absent:

  • Mr. Harold Knight, Vice-Chairman, Journeyman Plumber

DOL Staff present:

  • Mr. Michael Guida, Board Plumbing & Gas Code Consultant 
  • Mr. Charles Kilb, Board Legal Counsel
  • Mr. Michael Auerbach, Executive Director
  • Mr. James O’Reilly, State Plumbing and Gas Inspector
  • 1:01 p.m. Open Meeting Called to Order
    • Note Meeting Recording 
    • Roll Call by Chair for Quorum

Approval of Previous Meeting Minutes

  • Approval of Meeting Minutes
    • May 13, 2026, Subcommittee Meeting:

      Vote: WT to approve JC second

      Results:unanimously

  • Legal / Board Counsel Report – Charles Kilb

Board Counsel discussed a possible concurrency period for any new code adoption. Will discuss further at the next subcommittee meeting.

  • Discussion

Reviewed proposed changes for the following sections

  • 248 CMR 10.01, Scope and Jurisdiction

No changes made at this meeting

  • 248 CMR 10.02, Basic Principles

Members and staff reviewed the accessibility requirements for common laundry facilities, including whether access should be provided directly through the main building. The group also discussed the potential use of an outbuilding. Staff presented the following option for possible code language.  

The washing machine connection shall be located within the same building as the dwelling units to ensure that all occupants have reasonable access to a washing machine. Interior access to the laundry area is not required. The laundry room may be reached by an exterior entrance, provided the space is part of the same building structure.

 Vote: WT to approve JK second

 To approve: JC, BK, WT, RA, KG, JP, JK against JM

 Result: 7 to approve 1 against. Motion to approve passes.

  • 248 CMR 10.03, Definitions 

    Staff presented the proposed addition to the definition of Grease Interceptor (Hydro-Mechanical). Grease Interceptor (Hydro-Mechanical): A smaller interceptor, (normally installed inside a building) which is compact in size because grease separation occurs continuously due to several simultaneous actions; a hydraulic flow action, air entrainment and the difference in specific gravity between water and FOG (fats, oils and grease).

             Vote: WT to approve JC second

            Results:unanimously

  • 248 CMR 10.04, Testing and Safety

No changes made at this meeting

  • 248 CMR 10.05, General Regulations 

No changes made at this meeting

  • 248 CMR 10.06, Materials

    Staff presented adding a labeling requirement for 10.06 (2)(k) a Single Stack Sanitary Drainage System. Staff were asked to present possible label names at the next meeting.

    Staff also presented additional code requirements regarding a dedicated stack in addition to the dedicated system

         This matter is tabled and will be discussed at the next meeting.

  • 248 CMR 10.07, Joints and Connections

                 No changes made at this meeting

  • 248 CMR 10.08, Traps and Cleanouts

               No changes made at this meeting

  • 248 CMR 10.09, Interceptors, Separators and Holding Tanks

              No changes made at this meeting

  • 248 CMR 10.10 (14), Plumbing Fixtures 

    Staff presented the following proposed additions or changes.

     10.10 (4) (f) Change the title from Free Standing Tubs and Whirlpool Baths to use only the term Tubs.

    10.10 (4) (f) Add to #1 hot water supply temperature shall be a minimum of 110 degrees and not greater than 120 degrees. 

    10.10(6)(e) Exception from installing a priming device. Members asked staff to present at the next meeting proposed language regarding the use of tight tanks / unsewered areas with the use of trap primers. 

    10.10 (8)(a)d Add a reference to 10.02 Basic principle 6.

    10.10 (13)(c)  Emergency Wash Systems (c) Staff and members discussed adding possible language allowing one emergency shower to be sized independently and all other installations to be sized with two discharging simultaneously. Staff presented adding “for multiple showers” to the code section requiring multiple showers to be designed for two emergency showers operating simultaneously.

    10.10 (13)(e) Emergency Wash Systems (e) Staff and members discussed adding language defining the measurement. Staff presented the following possible language.

    Piping for systems shall be installed in a manner that prevents the stagnation of water. Piping from the main to each individual emergency equipment fixture connection shall not exceed a developed length of fifteen feet. Where a mixing valve is provided, the piping serving that valve includes a recirculation line. The developed length shall be measured from the outlet of the mixing valve to the emergency equipment fixture connection.

          Vote: WT to approve JC second

         Result: unanimously: JM was not present for this vote JC chaired

  • 248 CMR 10.11, Hangers and Support
    • 248 CMR 10.12, Indirect Waste Piping
  • No changes made at this meeting

             Staff presented the following proposed additions or changes.

               10.12 (1) (f) Remove Drawing 4 

              10.12 (1) (f) 1 Safe Waste Pans, add language to only allow metal safe waste pans for water heaters.

            10.12 (5) Installation of Indirect Waste Piping, Staff discussed adding language to allow clear water waste to discharge into the inlet of a trap. Members asked staff to present at the next meeting new language allowing clear water waste to discharge to the inlet side of a properly sized and vented trap

                     Vote: JC to approve JK seconded

                     Results: unanimously

  • 248 CMR 10.13, Piping and Treatment of Special Waste

    Not covered at this meeting

    • 248 CMR 10.14, Water Supply and Water Distribution System

                Not covered at this meeting

  • 248 CMR 10.15, Sanitary Drainage System

              Not covered at this meeting

Adjournment

Vote: Motion made by JC, RA seconded

Results: Unanimous

3:16 p.m.

Items relied upon during the open meeting

  • Agenda
  • Draft Minutes
  • Draft of 248 CMR 10.00

Note: If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.

Agenda

  • 1:00 p.m. Open Meeting Called to Order
    • Note Meeting Recording 
    • Roll Call by Chair for Quorum
MEMBERSAPPOINTMENT
Mr. JosephMcNameeChairman, MasterGas Fitter
Mr. HaroldKnightVice-Chairman Journeyman Plumber
Mr. John CruzMember, LP Installer
Mr. Bahig A. Kaldas,P. E.Member, Plumbing Engineer
Mr. WayneThomasMember Journeyman Gasfitter
Ms. RuthAlfassoMember, Dept.of Public Health
Mrs. Kimberly GarsideMember, Master Plumber
Mr. Joseph PelusoParticipant, Master Plumber
Mr. James KennedyLocal Inspector, Participant
STAFFPosition
Mr. CharlesKilbBoard LegalCounsel
Mr. Michael AuerbachExecutive Director
Mr. Michael GuidaBoard Code Consultant
Ms. Caitlyn BerryBoard Staff
Ms. Carrie MathesonBoard Staff
Mr. Scott PaddenState Plumbing & Gas Inspector
Mr. James O’ReillyState Plumbing & Gas Inspector
  • Approval of Meeting Minutes
    • May 13, 2026, Regular Meeting
  • Legal / Board Counsel Report – Charles Kilb
  • Discussion
    • Reviewed proposed changes for the following sections
    • 248 CMR 10.01, Scope and Jurisdiction
    • 248 CMR 10.02, Basic Principles
    • 248 CMR 10.03, Definitions
    • 248 CMR 10.04, Testing and Safety
    • 248 CMR 10.05, General Regulations 
    • 248 CMR 10.06, Materials
    • 248 CMR 10.07, Joints and Connections
    • 248 CMR 10.08, Traps and Cleanouts
    • 248 CMR 10.09, Interceptors, Separators and Holding Tanks
    • 248 CMR 10.10 (14), Plumbing Fixtures 
    • 248 CMR 10.11, Hangers and Supports
    • 248 CMR 10.12, Indirect Waste Piping
    • 248 CMR 10.13, Piping and Treatment of Special Waste
    • 248 CMR 10.14, Water Supply and Water Distribution System
    • 248 CMR 10.15, Sanitary Drainage System

Adjournment

Note: If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback