- This page, Board of State Examiners of Plumbers and Gas Fitters Code Subcommittee Meeting - 6.17.26, is offered by
- Division of Occupational Licensure
- Board of State Examiners of Plumbers and Gas Fitters
Public Meeting Notice Board of State Examiners of Plumbers and Gas Fitters Code Subcommittee Meeting - 6.17.26
Overview
This is a remote meeting. You can participate from your computer, laptop, or smartphone. See Meeting Agenda for details.
You will need
Microsoft Teams meeting link and phone number
Join: Join the Microsoft Teams Meeting
Meeting ID: 286 917 850 253 233
Passcode: zG9wQ6ur
Dial in by phone
+1 857-327-9245,,123154358# United States, Boston
Phone conference ID: 123 154 358#
In accordance with the provisions of G.L. c. 30A § 20, notice is hereby given that the Board of State Examiners of Plumbers and Gas Fitters Plumbing Board Subcommittee will be convening their monthly meeting.
Meeting Minutes
In accordance with the provisions of G.L. c. 30A § 20, the Board of State Examiners of Plumbers and Gas Fitters convened a meeting of its Plumbing Code Subcommittee meeting:
Microsoft Teams Meeting Wednesday June 17, 2026, at 1:01 pm.
The topics shown below were discussed at the aforementioned meeting. At 1 pm, the Chair, Joseph McNamee called the open meeting to order.
Informational note: All votes were taken by roll call. Where each member voted in favor, the vote will be reported as unanimous.
Board members present:
- Mr. Joseph McNamee, Chairman, Master Gas Fitter
- Mr. John Cruz, Member, LP Installer
- Mr. Bahig A. Kaldas, P.E., Member, plumbing Engineer
- Mr. Wayne Thomas, Member, Journeyman Gas Fitter
- Ms. Ruth Alfasso, Member, Department of Public Health
- Ms. Sarah Badway, Public Member
- Mr. Dan Kilburn, Member, DOL Designee
- Ms. Kimberly Garside, Member, Master Plumber
Board members absent:
- Mr. Harold Knight, Vice-Chairman, Journeyman Plumber
DOL Staff present:
- Mr. Michael Guida, Board Plumbing & Gas Code Consultant
- Mr. Charles Kilb, Board Legal Counsel
- Mr. Michael Auerbach, Executive Director
- Mr. James O’Reilly, State Plumbing and Gas Inspector
- 1:01 p.m. Open Meeting Called to Order
- Note Meeting Recording
- Roll Call by Chair for Quorum
Approval of Previous Meeting Minutes
- Approval of Meeting Minutes
- May 13, 2026, Subcommittee Meeting:
Vote: WT to approve JC second
Results:unanimously
- Legal / Board Counsel Report – Charles Kilb
Board Counsel discussed a possible concurrency period for any new code adoption. Will discuss further at the next subcommittee meeting.
- Discussion
Reviewed proposed changes for the following sections
- 248 CMR 10.01, Scope and Jurisdiction
No changes made at this meeting
- 248 CMR 10.02, Basic Principles
Members and staff reviewed the accessibility requirements for common laundry facilities, including whether access should be provided directly through the main building. The group also discussed the potential use of an outbuilding. Staff presented the following option for possible code language.
The washing machine connection shall be located within the same building as the dwelling units to ensure that all occupants have reasonable access to a washing machine. Interior access to the laundry area is not required. The laundry room may be reached by an exterior entrance, provided the space is part of the same building structure.
Vote: WT to approve JK second
To approve: JC, BK, WT, RA, KG, JP, JK against JM
Result: 7 to approve 1 against. Motion to approve passes.
248 CMR 10.03, Definitions
Staff presented the proposed addition to the definition of Grease Interceptor (Hydro-Mechanical). Grease Interceptor (Hydro-Mechanical): A smaller interceptor, (normally installed inside a building) which is compact in size because grease separation occurs continuously due to several simultaneous actions; a hydraulic flow action, air entrainment and the difference in specific gravity between water and FOG (fats, oils and grease).
Vote: WT to approve JC second
Results:unanimously
- 248 CMR 10.04, Testing and Safety
No changes made at this meeting
- 248 CMR 10.05, General Regulations
No changes made at this meeting
248 CMR 10.06, Materials
Staff presented adding a labeling requirement for 10.06 (2)(k) a Single Stack Sanitary Drainage System. Staff were asked to present possible label names at the next meeting.
Staff also presented additional code requirements regarding a dedicated stack in addition to the dedicated system
This matter is tabled and will be discussed at the next meeting.
- 248 CMR 10.07, Joints and Connections
No changes made at this meeting
- 248 CMR 10.08, Traps and Cleanouts
No changes made at this meeting
- 248 CMR 10.09, Interceptors, Separators and Holding Tanks
No changes made at this meeting
248 CMR 10.10 (14), Plumbing Fixtures
Staff presented the following proposed additions or changes.
10.10 (4) (f) Change the title from Free Standing Tubs and Whirlpool Baths to use only the term Tubs.
10.10 (4) (f) Add to #1 hot water supply temperature shall be a minimum of 110 degrees and not greater than 120 degrees.
10.10(6)(e) Exception from installing a priming device. Members asked staff to present at the next meeting proposed language regarding the use of tight tanks / unsewered areas with the use of trap primers.
10.10 (8)(a)d Add a reference to 10.02 Basic principle 6.
10.10 (13)(c) Emergency Wash Systems (c) Staff and members discussed adding possible language allowing one emergency shower to be sized independently and all other installations to be sized with two discharging simultaneously. Staff presented adding “for multiple showers” to the code section requiring multiple showers to be designed for two emergency showers operating simultaneously.
10.10 (13)(e) Emergency Wash Systems (e) Staff and members discussed adding language defining the measurement. Staff presented the following possible language.
Piping for systems shall be installed in a manner that prevents the stagnation of water. Piping from the main to each individual emergency equipment fixture connection shall not exceed a developed length of fifteen feet. Where a mixing valve is provided, the piping serving that valve includes a recirculation line. The developed length shall be measured from the outlet of the mixing valve to the emergency equipment fixture connection.
Vote: WT to approve JC second
Result: unanimously: JM was not present for this vote JC chaired
- 248 CMR 10.11, Hangers and Support
- 248 CMR 10.12, Indirect Waste Piping
- No changes made at this meeting
Staff presented the following proposed additions or changes.
10.12 (1) (f) Remove Drawing 4
10.12 (1) (f) 1 Safe Waste Pans, add language to only allow metal safe waste pans for water heaters.
10.12 (5) Installation of Indirect Waste Piping, Staff discussed adding language to allow clear water waste to discharge into the inlet of a trap. Members asked staff to present at the next meeting new language allowing clear water waste to discharge to the inlet side of a properly sized and vented trap
Vote: JC to approve JK seconded
Results: unanimously
248 CMR 10.13, Piping and Treatment of Special Waste
Not covered at this meeting
- 248 CMR 10.14, Water Supply and Water Distribution System
Not covered at this meeting
- 248 CMR 10.15, Sanitary Drainage System
Not covered at this meeting
Adjournment
Vote: Motion made by JC, RA seconded
Results: Unanimous
3:16 p.m.
Items relied upon during the open meeting
- Agenda
- Draft Minutes
- Draft of 248 CMR 10.00
Note: If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.
Agenda
- 1:00 p.m. Open Meeting Called to Order
- Note Meeting Recording
- Roll Call by Chair for Quorum
| MEMBERS | APPOINTMENT |
|---|---|
| Mr. JosephMcNamee | Chairman, MasterGas Fitter |
| Mr. HaroldKnight | Vice-Chairman Journeyman Plumber |
| Mr. John Cruz | Member, LP Installer |
| Mr. Bahig A. Kaldas,P. E. | Member, Plumbing Engineer |
| Mr. WayneThomas | Member Journeyman Gasfitter |
| Ms. RuthAlfasso | Member, Dept.of Public Health |
| Mrs. Kimberly Garside | Member, Master Plumber |
| Mr. Joseph Peluso | Participant, Master Plumber |
| Mr. James Kennedy | Local Inspector, Participant |
| STAFF | Position |
| Mr. CharlesKilb | Board LegalCounsel |
| Mr. Michael Auerbach | Executive Director |
| Mr. Michael Guida | Board Code Consultant |
| Ms. Caitlyn Berry | Board Staff |
| Ms. Carrie Matheson | Board Staff |
| Mr. Scott Padden | State Plumbing & Gas Inspector |
| Mr. James O’Reilly | State Plumbing & Gas Inspector |
- Approval of Meeting Minutes
- May 13, 2026, Regular Meeting
- Legal / Board Counsel Report – Charles Kilb
- Discussion
- Reviewed proposed changes for the following sections
- 248 CMR 10.01, Scope and Jurisdiction
- 248 CMR 10.02, Basic Principles
- 248 CMR 10.03, Definitions
- 248 CMR 10.04, Testing and Safety
- 248 CMR 10.05, General Regulations
- 248 CMR 10.06, Materials
- 248 CMR 10.07, Joints and Connections
- 248 CMR 10.08, Traps and Cleanouts
- 248 CMR 10.09, Interceptors, Separators and Holding Tanks
- 248 CMR 10.10 (14), Plumbing Fixtures
- 248 CMR 10.11, Hangers and Supports
- 248 CMR 10.12, Indirect Waste Piping
- 248 CMR 10.13, Piping and Treatment of Special Waste
- 248 CMR 10.14, Water Supply and Water Distribution System
- 248 CMR 10.15, Sanitary Drainage System
Adjournment
Note: If you need reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.